Citas bibligráficas
Aguirre, P., (2022). Propuesta de mejora en el área de mantenimiento para reducir los costos operativos en una empresa de transportes ubicada en la ciudad de Trujillo, 2022 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/31040
Aguirre, P., Propuesta de mejora en el área de mantenimiento para reducir los costos operativos en una empresa de transportes ubicada en la ciudad de Trujillo, 2022 [Tesis]. PE: Universidad Privada del Norte; 2022. https://hdl.handle.net/11537/31040
@misc{renati/524431,
title = "Propuesta de mejora en el área de mantenimiento para reducir los costos operativos en una empresa de transportes ubicada en la ciudad de Trujillo, 2022",
author = "Aguirre Castillo, Pedro Ricardo",
publisher = "Universidad Privada del Norte",
year = "2022"
}
The present research study was carried out in the company Transporte Chavin Express in a company specialized in urgent transport services for parcels and documentation as well as moving, at a national level and within the business environment. The general objective of the research work was to determine to what extent the improvement proposal in the maintenance area affects the operating costs of the company Transportes Chavin Express SAC. All the factors that affect the management of the maintenance area were evaluated and the impact they cause was recognized. Among the most raised inconveniences in the maintenance area are: inadequate distribution of facilities, non-existence of supplier evaluation, inadequate method of preventive maintenance and personnel not trained in maintenance. Faced with this, the implementation of the SLP, Supplier Evaluation, TPM and Training Plan tools was proposed. All these drawbacks generate a loss of S/42,997.84 soles. Finally, the financial economic evaluation was carried out, and it was concluded that the investment necessary for the implementation is justifiable, since it presents a positive NPV (S/1,177.21) and an IRR of 87% (the minimum expected return is 60%). In addition, there is a cost benefit of S/1.13, which is greater than 1 and the return on investment (PRI) is 0.72 years.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons