Leon, J., Pré, H. (2022). Optimización de un plan de gestión de procesos constructivos basados en principios Lean Construction para un sistema constructivo de ductilidad limitada del Condominio La Ribera de Santa Clara, Ate-2019 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/29602
Leon, J., Pré, H. Optimización de un plan de gestión de procesos constructivos basados en principios Lean Construction para un sistema constructivo de ductilidad limitada del Condominio La Ribera de Santa Clara, Ate-2019 [Tesis]. PE: Universidad Privada del Norte; 2022. https://hdl.handle.net/11537/29602
@misc{renati/517813,
title = "Optimización de un plan de gestión de procesos constructivos basados en principios Lean Construction para un sistema constructivo de ductilidad limitada del Condominio La Ribera de Santa Clara, Ate-2019",
author = "Pré Doria, Hugo Alejandro",
publisher = "Universidad Privada del Norte",
year = "2022"
}
The present investigation refers to an exploratory field investigation, which aims to develop a management plan for the optimization of construction processes based on Lean Construction principles in buildings with a construction system of limited ductility. For the above, a review will be given to the documents related to the productivity of a work of limited ductility of more than six floors executed in the city of Lima. This work has already been executed and concluded, for which it is assumed as a referent of the perceived reality in this type of works, based on real data that give validity to the present investigation, said data is organized and analyzed with the purpose of detect productivity and propose the necessary improvements that are applicable to this type of works. The general problem of optimization of the construction processes was solved by means of the four specific objectives proposed, determining the productivity levels of the management plan, optimizing the management plan, determining the PPC of the management plan and measuring the yields through the learning curve, all this through the Lean Construction methodology. The results obtained in the present investigation for four main items studied are a significant improvement in the items studied, obtaining an improved TP by 8.32%, and a TNC reduced by 7.75% when applying Lean Construction. In addition, an aggregate PPC of 75% has been obtained and the returns through the learning curve have risen to an average of 94.5%.