Capac, N., Diaz, E. (2023). Implementación de un sistema de gestión de riesgos basado en el método Smith complementado con la Guía del PMBOK sexta edición, con el fin de asegurar el cumplimiento del cronograma en la obra de vivienda multifamiliar edificio Bertello – etapa de estructuras [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/36980
Capac, N., Diaz, E. Implementación de un sistema de gestión de riesgos basado en el método Smith complementado con la Guía del PMBOK sexta edición, con el fin de asegurar el cumplimiento del cronograma en la obra de vivienda multifamiliar edificio Bertello – etapa de estructuras [Tesis]. PE: Universidad Privada del Norte; 2023. https://hdl.handle.net/11537/36980
@misc{renati/515539,
title = "Implementación de un sistema de gestión de riesgos basado en el método Smith complementado con la Guía del PMBOK sexta edición, con el fin de asegurar el cumplimiento del cronograma en la obra de vivienda multifamiliar edificio Bertello – etapa de estructuras",
author = "Diaz Altez, Enrique Anselmo",
publisher = "Universidad Privada del Norte",
year = "2023"
}
This investigation was carried out due to the constant delays in the construction of buildings, this is due to different factors such as technical, execution, logistics and transportation, subcontractors and suppliers, climatic conditions and natural, contractual and legal phenomena, other risks, thus generating non-compliance with the schedule, which is why a risk management system is being implemented based on the Smith method complemented with the PMBOK for the execution of the Bertello multifamily housing, thus identifying, analyzing, planning and controlling risks, focusing mainly in the structure stage in order to meet the schedule; it is for this reason that the main objective is to implement a risk management system based on the Smith method complemented with the PMBOK sixth edition guide for compliance with the schedule in the multifamily housing project Bertello building, structures stage. It has an application type study, with a quantitative type approach, explanatory level, experimental type design; the study sample is all engineers and foremen, and the type of sampling is non-probabilistic. As a result, it was found that the work on the Bertello building, the structures stage, ended one month earlier than planned, with a real cost of S/ 645,390.39, which was less than the planned cost. Finally, it is concluded that an effective implementation of the risk management system positively influences compliance with the schedule.