title = "Gestión de la calidad en una empresa constructora – Caso de estudio proyecto Cierre de Desmonte en Unidad Minera Juana Contratista Grupo Tezla SAC",
author = "Chevarria Cazorla, Yuri Ivan",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2024"
}
The principal objective of this study is to evaluate the impact of a quality control system of the construction company Tezla SAC for the “Cierre de Depósito de Desmonte“ project at the Juana Mining Unit, through the study and evaluation of its records of nonconformities that were issued during construction, verifying the impacts on costs and time in the project's execution. The study began with a situational diagnosis of the company, identifying the principal deficiencies in programming, administration and quality control during construction, which originated quality deviations in the construction processes, which were documented by means of nonconformity reports, The nonconformities will be reviewed by analyzing the rework that was necessary to comply with compliant products, raising the observations made in these reports. With this analysis we will be able to define its incidence in the costs and scheduled time of the project. According to the analysis of costs and time of the nonconformities, we will make a proposal of a Quality Management Plan for the construction companies, which will minimize the nonconforming products, improving the profitability of the construction companies. A quality control system is proposed under the ISO 9001:2015 standard and under the PMBOK® guide in the Project Quality Management section, which helps to improve and control the performance of processes and activities through continuous improvement, managing to meet the needs of private construction companies in the mining sector. Finally, the conclusions of this study and recommendations for construction companies operating within a mining unit will be presented, in order to propose the use of an effective and appropriate quality system for their operations.