Citas bibligráficas
Loyaga, E., Malqui, K. (2019). Nivel de criticidad del riesgo operativo del proceso de transporte y entrega de materiales en la Empresa Central Dino SAC Parque Industrial de Trujillo - 2018 [Tesis, Universidad Privada Antenor Orrego - UPAO]. https://hdl.handle.net/20.500.12759/5655
Loyaga, E., Malqui, K. Nivel de criticidad del riesgo operativo del proceso de transporte y entrega de materiales en la Empresa Central Dino SAC Parque Industrial de Trujillo - 2018 [Tesis]. : Universidad Privada Antenor Orrego - UPAO; 2019. https://hdl.handle.net/20.500.12759/5655
@misc{renati/377679,
title = "Nivel de criticidad del riesgo operativo del proceso de transporte y entrega de materiales en la Empresa Central Dino SAC Parque Industrial de Trujillo - 2018",
author = "Malqui Guevara, Karen Gianella",
publisher = "Universidad Privada Antenor Orrego - UPAO",
year = "2019"
}
The objective of this research work is to determine the level of criticality of the operational risk of the process of transport and delivery of materials in the central company DINO SAC Industrial Park. The contrast design that was used is the transversal descriptive design, this design aims to measure and describe the prevalence of an exposure and / or result in a defined population and at a specific point of time. The sample size used was equivalent to the sample framework because it is the total population, since the company DINO SAC Industrial Park has 36 drivers in total being a non-probabilistic sampling. The investigation, observation, documentary compilation and survey were used as research techniques. The interview was conducted directly to the head of the distribution area. On the other hand, the survey of the drivers of the company was carried out, to verify if they were aware of the risks, they face in carrying out their functions and the impact that it generates if it occurs. The methodology used in this thesis to measure risks is that issued in Switzerland by the Basel II Supervisory Committee on Banking. Proven that the company DINO SAC has a low level of risk with 84% and even a level of significance of 5%, in the process of transport and delivery of materials, because they carry out controls and coordination before starting their activities, avoiding with that the emerging risks materialize.
IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.