Torres, J., Torres, J. (2024). Implementación del modelo de gestión para los proyectos de edificación, en función al dominio de desempeño de medición de la Guía PMBOK 7ma edición [Tesis, Universidad Privada Antenor Orrego]. https://hdl.handle.net/20.500.12759/29931
Torres, J., Torres, J. Implementación del modelo de gestión para los proyectos de edificación, en función al dominio de desempeño de medición de la Guía PMBOK 7ma edición [Tesis]. PE: Universidad Privada Antenor Orrego; 2024. https://hdl.handle.net/20.500.12759/29931
@misc{renati/374886,
title = "Implementación del modelo de gestión para los proyectos de edificación, en función al dominio de desempeño de medición de la Guía PMBOK 7ma edición",
author = "Torres Luis, Jenry Wilson",
publisher = "Universidad Privada Antenor Orrego",
year = "2024"
}
The main objective of this research work is to develop a management model for building projects, based on the measurement performance domain; For which three different projects are evaluated, two multi-family buildings (Trujillo and Piura) and an improvement of health services (Cajamarca). The type of research was quantitative and descriptive and presents two types of research designs, the non-experimental longitudinal trend type, which applies to the first, second and fourth specific objectives; and the type of pre-experiment experimental design that applies to our third specific objective. The results were a template in Microsoft Excel that contains a performance evaluation to evaluate performance with respect to the baseline for a project, as well as determining the value of the business and obtaining forecasts of time, cost and profitability of the project. project. It is concluded that for project 1, for both the month of May and the month of August, values of -S/ 1,055,421.15 and -S/ 93,989.56 were obtained, respectively; which shows that the project is behind schedule both in cost and schedule. Regarding the business value for project number 2, referring to the construction of a five-story multifamily building in the city of Piura, a net present value (NPV) of $224,582.57 was obtained, a return on investment (ROIC) of 18.15% and an economic value added (EVA) of $4843.83; which shows that under the pre- established conditions the project is profitable. Finally, regarding project number 3, it was obtained with 95% certainty that the maximum total duration of the project will be 332.33 days, that is, 39 days more than expected; Likewise, it is expected to have a final cost of the project of S/. 4121326.94, this amount is 17% higher than the expected amount of S/ xi 3,509,225.26; In conclusion, there is a 95% probability that the project will have a higher cost and longer duration