Gilham, A., (2019). Propuesta de mejora en el sistema de planeamiento y control de la producción en una empresa metalmecánica [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/625864
Gilham, A., Propuesta de mejora en el sistema de planeamiento y control de la producción en una empresa metalmecánica [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2019. http://hdl.handle.net/10757/625864
@misc{renati/368564,
title = "Propuesta de mejora en el sistema de planeamiento y control de la producción en una empresa metalmecánica",
author = "Gilham Celis, Adriana Catherine",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2019"
}
The present project proposes to reduce the stock of finished product and the IR starting with the five VIP products (conventional coated electrodes); because the current average stock is at 350 tons while the company's goal is 200 tons; likewise, the current IR is 1.92 laps and you want to reach an IR of 3 laps; thus generating an economic impact of $ 177,237 on average at the end of each month in value of inventories. For this, the processes of planning and control of production and the standards and policies established in the company are analyzed. The development of this report is in accordance with the theoretical approaches investigated in research articles published in journals and books by several actors with experience in inventories. It is worth mentioning that this project focuses mainly on applying the Lean Manufacturing methodology using the Kanban Pull System tool, since it was seen that the main cause is that it currently presents a planning policy based on plant capacity (Push System). Finally, the viability of the improvement proposal was validated through a simulation proposal, a theoretical proposal, comparison of indicators and economic flow. From the previous analysis, it was obtained that the Productivity increased from 286 to 301 kg / hh, the number of workers decreased from 117 to 90, plant capacity decreased from 74 to 59 tons, and the recovery period of the project investment is of 0.33 months.