Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Aguila, M., De, D. (2021). Estudio de prefactibilidad para la instalación de una planta de producción de cold brew coffee embotellado [Universidad de Lima]. https://hdl.handle.net/20.500.12724/15026
Aguila, M., De, D. Estudio de prefactibilidad para la instalación de una planta de producción de cold brew coffee embotellado []. PE: Universidad de Lima; 2021. https://hdl.handle.net/20.500.12724/15026
@misc{renati/235223,
title = "Estudio de prefactibilidad para la instalación de una planta de producción de cold brew coffee embotellado",
author = "De Olarte Tweddle, David Patrick",
publisher = "Universidad de Lima",
year = "2021"
}
Title: Estudio de prefactibilidad para la instalación de una planta de producción de cold brew coffee embotellado
Advisor(s): Espinoza Matos, José Francisco
Keywords: Bebidas de café; Alimentos naturales; Industria de las bebidas; Estudios de factibilidad; Coffee drinks; Natural food; Beverage industry; Feasibility studies
OCDE field: https://purl.org/pe-repo/ocde/ford#2.11.04
Issue Date: 2021
Institution: Universidad de Lima
Abstract: El objetivo de este trabajo es evaluar la viabilidad de la instalación de una planta
producción de Cold-brew Coffee embotellado para satisfacer la demanda de una bebida
de café saludable, refrescante, lista para consumir y con propiedades energizantes.
Capítulo I: problemática a solucionar, objetivos e hipótesis de la investigación y
justificación sobre la viabilidad del proyecto.
Capítulo II: definición y características del producto, análisis del sector y modelo
de negocio. Así como también el mercado objetivo, demanda del proyecto y las
estrategias que se utilizarán para impulsar y comercializar el producto.
Capítulo III: factores técnicos, económicos y sociales para evaluar la localización
más conveniente para la planta del proyecto. Teniendo como resultado óptimo Chorrillos,
Lima.
Capítulo IV: destinado a encontrar el tamaño óptimo de planta, siendo el tamaño–
tecnología el que determina el tamaño de planta del proyecto.
Capítulo V: ingeniería del proyecto. Se tocarán puntos como definición técnica
del producto, tecnologías existentes y proceso de producción, maquinaria, capacidad
instalada, aspectos ambientales, seguridad, cadena de suministros, plan de producción,
servicios y disposición de planta.
Capítulo VI: aspectos administrativos de la empresa, los puestos de trabajo
requeridos y la descripción y jerarquía de los mismos.
Capítulo VII: evaluación económica y financiera del proyecto, así como el detalle
de presupuestos. Se llegó a la conclusión de que el proyecto es viable, y atractivo para
los inversionistas. Del análisis económico, se obtuvo VAN S/ 678 710 y TIR 50,68%.
Del análisis financiero, VAN S/ 717 229 y TIR 62,20%.
Capítulo VIII: evaluación social del proyecto. La planta está ubicada en el distrito
de Chorrillos, el cual se verá favorecido por la generación de impuestos y arbitrios,
además de puestos de. En cuanto a indicadores, el proyecto genera S/ 8 355 241 de valor
agregado, S/ 43 875,3 de productividad por cada puesto de trabajo. Por otro lado, la
intensidad del capital es del 6,80%.
The objective of this work is to evaluate the viability of the installation of a bottled Cold brew Coffee production plant to satisfy the demand for a healthy, refreshing and ready to-drink coffee drink with energizing properties. Chapter I: problem to be solved, objectives and hypotheses of the investigation and justification on the viability of the project. Chapter II: definition and characteristics of the product, analysis of the sector and business model. As well as the target market, demand for the project and the strategies that will be used to promote and commercialize the product. Chapter III: technical, economic and social factors to evaluate the most convenient location for the project plant. Having as optimal result Chorrillos, Lima. Chapter IV: aimed at finding the optimal plant size, being the size-technology that determines the plant size of the project. Chapter V: project engineering. Different topics as technical definition of the product, existing technologies and production process, machinery, installed capacity, environmental aspects, safety, supply chain, production plan, services and plant layout. Chapter VI: administrative aspects of the company, the required jobs and their description and hierarchy. Chapter VII: economic and financial evaluation of the project, as well as the detail of budgets. It was concluded that the project is viable, and attractive to investors. From the economic analysis, VAN S/ 678 710 and IRR 50.68%. From the financial analysis, NPV S/ 717 229 and IRR 62,20%. Chapter VIII: social evaluation of the project. The plant is located in the district of Chorrillos, which will be favored by the generation of taxes and excise duties, in addition to job positions. Regarding indicators, the project generates S/ 8 355 241 of added value, S/ 43 875.3 of productivity for each job position. On the other hand, the capital intensity is 6,80%.
The objective of this work is to evaluate the viability of the installation of a bottled Cold brew Coffee production plant to satisfy the demand for a healthy, refreshing and ready to-drink coffee drink with energizing properties. Chapter I: problem to be solved, objectives and hypotheses of the investigation and justification on the viability of the project. Chapter II: definition and characteristics of the product, analysis of the sector and business model. As well as the target market, demand for the project and the strategies that will be used to promote and commercialize the product. Chapter III: technical, economic and social factors to evaluate the most convenient location for the project plant. Having as optimal result Chorrillos, Lima. Chapter IV: aimed at finding the optimal plant size, being the size-technology that determines the plant size of the project. Chapter V: project engineering. Different topics as technical definition of the product, existing technologies and production process, machinery, installed capacity, environmental aspects, safety, supply chain, production plan, services and plant layout. Chapter VI: administrative aspects of the company, the required jobs and their description and hierarchy. Chapter VII: economic and financial evaluation of the project, as well as the detail of budgets. It was concluded that the project is viable, and attractive to investors. From the economic analysis, VAN S/ 678 710 and IRR 50.68%. From the financial analysis, NPV S/ 717 229 and IRR 62,20%. Chapter VIII: social evaluation of the project. The plant is located in the district of Chorrillos, which will be favored by the generation of taxes and excise duties, in addition to job positions. Regarding indicators, the project generates S/ 8 355 241 of added value, S/ 43 875.3 of productivity for each job position. On the other hand, the capital intensity is 6,80%.
Link to repository: https://hdl.handle.net/20.500.12724/15026
Discipline: Ingeniería Industrial
Grade or title grantor: Universidad de Lima. Facultad de Ingeniería y Arquitectura
Grade or title: Ingeniero Industrial
Juror: Hernandez Gorritti, Wilfredo Román; Collao Diaz, Martin Fidel; Montero Sarmiento, Edgardo
Register date: 2-Feb-2022
This item is licensed under a Creative Commons License