Look-up in Google Scholar
Full metadata record
Espinoza Matos, José Francisco
Aguila Alarcon, Mauricio Manuel
De Olarte Tweddle, David Patrick
2022-02-02T19:05:36Z
2022-02-02T19:05:36Z
2021
Aguila Alarcon, M. M. y De Olarte Tweddle, D. P. (2021). Estudio de prefactibilidad para la instalación de una planta de producción de cold brew coffee embotellado [Tesis para optar el Título Profesional de Ingeniero Industrial, Universidad de Lima]. Repositorio institucional de la Universidad de Lima. https://hdl.handle.net/20.500.12724/15026 (es_PE)
https://hdl.handle.net/20.500.12724/15026
El objetivo de este trabajo es evaluar la viabilidad de la instalación de una planta producción de Cold-brew Coffee embotellado para satisfacer la demanda de una bebida de café saludable, refrescante, lista para consumir y con propiedades energizantes. Capítulo I: problemática a solucionar, objetivos e hipótesis de la investigación y justificación sobre la viabilidad del proyecto. Capítulo II: definición y características del producto, análisis del sector y modelo de negocio. Así como también el mercado objetivo, demanda del proyecto y las estrategias que se utilizarán para impulsar y comercializar el producto. Capítulo III: factores técnicos, económicos y sociales para evaluar la localización más conveniente para la planta del proyecto. Teniendo como resultado óptimo Chorrillos, Lima. Capítulo IV: destinado a encontrar el tamaño óptimo de planta, siendo el tamaño– tecnología el que determina el tamaño de planta del proyecto. Capítulo V: ingeniería del proyecto. Se tocarán puntos como definición técnica del producto, tecnologías existentes y proceso de producción, maquinaria, capacidad instalada, aspectos ambientales, seguridad, cadena de suministros, plan de producción, servicios y disposición de planta. Capítulo VI: aspectos administrativos de la empresa, los puestos de trabajo requeridos y la descripción y jerarquía de los mismos. Capítulo VII: evaluación económica y financiera del proyecto, así como el detalle de presupuestos. Se llegó a la conclusión de que el proyecto es viable, y atractivo para los inversionistas. Del análisis económico, se obtuvo VAN S/ 678 710 y TIR 50,68%. Del análisis financiero, VAN S/ 717 229 y TIR 62,20%. Capítulo VIII: evaluación social del proyecto. La planta está ubicada en el distrito de Chorrillos, el cual se verá favorecido por la generación de impuestos y arbitrios, además de puestos de. En cuanto a indicadores, el proyecto genera S/ 8 355 241 de valor agregado, S/ 43 875,3 de productividad por cada puesto de trabajo. Por otro lado, la intensidad del capital es del 6,80%. (es_PE)
The objective of this work is to evaluate the viability of the installation of a bottled Cold brew Coffee production plant to satisfy the demand for a healthy, refreshing and ready to-drink coffee drink with energizing properties. Chapter I: problem to be solved, objectives and hypotheses of the investigation and justification on the viability of the project. Chapter II: definition and characteristics of the product, analysis of the sector and business model. As well as the target market, demand for the project and the strategies that will be used to promote and commercialize the product. Chapter III: technical, economic and social factors to evaluate the most convenient location for the project plant. Having as optimal result Chorrillos, Lima. Chapter IV: aimed at finding the optimal plant size, being the size-technology that determines the plant size of the project. Chapter V: project engineering. Different topics as technical definition of the product, existing technologies and production process, machinery, installed capacity, environmental aspects, safety, supply chain, production plan, services and plant layout. Chapter VI: administrative aspects of the company, the required jobs and their description and hierarchy. Chapter VII: economic and financial evaluation of the project, as well as the detail of budgets. It was concluded that the project is viable, and attractive to investors. From the economic analysis, VAN S/ 678 710 and IRR 50.68%. From the financial analysis, NPV S/ 717 229 and IRR 62,20%. Chapter VIII: social evaluation of the project. The plant is located in the district of Chorrillos, which will be favored by the generation of taxes and excise duties, in addition to job positions. Regarding indicators, the project generates S/ 8 355 241 of added value, S/ 43 875.3 of productivity for each job position. On the other hand, the capital intensity is 6,80%. (en_EN)
application/pdf
spa
Universidad de Lima
info:eu-repo/semantics/openAccess (*)
https://creativecommons.org/licenses/by-nc-sa/4.0/ (*)
Repositorio Institucional Ulima
Universidad de Lima
Bebidas de café (es_PE)
Alimentos naturales (es_PE)
Industria de las bebidas (es_PE)
Estudios de factibilidad (es_PE)
Coffee drinks (en_EN)
Natural food (en_EN)
Beverage industry (en_EN)
Feasibility studies (en_EN)
Ingeniería industrial / Producción (es_PE)
Estudio de prefactibilidad para la instalación de una planta de producción de cold brew coffee embotellado (es_PE)
info:eu-repo/semantics/bachelorThesis
Universidad de Lima. Facultad de Ingeniería y Arquitectura (es_PE)
Ingeniería Industrial (es_PE)
Título profesional (es_PE)
Ingeniero Industrial (es_PE)
PE
https://purl.org/pe-repo/ocde/ford#2.11.04
http://purl.org/pe-repo/renati/level#tituloProfesional (*)
40152366
https://orcid.org/0000-0001-8804-5622
76261991
73041250
722026
Hernandez Gorritti, Wilfredo Román
Collao Diaz, Martin Fidel
Montero Sarmiento, Edgardo
https://purl.org/pe-repo/renati/type#tesis (*)
Privada asociativa



This item is licensed under a Creative Commons License Creative Commons