Título: Improvement proposal to increase the oee in a mechanical press in the metalworking sector through SMED and TPM
Asesor(es): Flores Pérez, Alberto Enrique
Palabras clave: PendientePendiente
Campo OCDE: https://purl.org/pe-repo/ocde/ford#2.11.04
Fecha de publicación: 2024
Institución: Universidad de Lima
Resumen: El sector metalmecánico es uno de los impactan en mayor medida al Perú, poseyendo el 25.9% de la PEA de industria manufacturera. Por ello mismo, es vital aprovechar al máximo la disponibilidad de sus máquinas. En el caso de estudio, se identificó que una empresa perteneciente a este sector contaba con un OEE del 56.39%. Esto generaba que, mensualmente, la organización tuviera una pérdida económica de $55,892.85. Esto era provocado por numerosas fallas de máquina y un deficiente set up. Para solucionar ello, se propuso un modelo que combina las herramientas TPM y SMED, con un soporte de la herramienta 5S. De este modo, se logró incrementar el OEE a 88.45% y reducir los tiempos de set up de un valor inicial de 24.09 a 12.85 minutos. Además, se logró aumentar la disponibilidad en un 40.58%. Por otro lado, es importante indicar que se realizó una evaluación económica en la que se logró demostrar que al cabo de un año se obtuvo un VAN de $99,286.89, un TIR de 67% y un periodo de recuperación de 4 meses y 13 días. Cabe resaltar que el presente modelo propuesto fue validado por medio del software de simulación Arena.

The metalworking sector is one of the industries that has more impact on Peru, representing 25.9% of the manufacturing industry's workforce. Therefore, it is crucial for them to approach the biggest availability possible for its machines. In this case study, it was identified that a company that belonged to this sector had an OEE (Overall Equipment Efficiency) of 56.39%. This resulted in a monthly economic loss of $55,892.85, caused by numerous machine failures and a deficient set-up process. A model that combined TPM (Total Productive Maintenance) and SMED (Single-Minute Exchange of Die) methodologies was proposed to solve the issue, supported by the 5S tool. As a result, the OEE increased to 88.45%, and the set-up time was reduced from an initial value of 24.09 to 12.85 minutes. Additionally, the availability was increased by 40.58%. Furthermore, it is important to note that an economic evaluation was done, showing that after one year, a Net Present Value (NPV) of $99,286.89 was achieved, with an Internal Rate of Return (IRR) of 67% and a payback period of 4 months and 13 days. Finally, it is worth mentioning that the proposed model was validated using a simulation through Arena software.
Nota: El acceso al texto completo de la tesis estará habilitado el 21 de junio de 2026, por expresa disposición del autor.
Disciplina académico-profesional: Ingeniería Industrial
Institución que otorga el grado o título: Universidad de Lima. Facultad de Ingeniería
Grado o título: Ingeniero Industrial
Jurado: Calderon Gonzales, Wilson David.; Quiroz Flores, Juan Carlos; Flores Pérez, Alberto Enrique
Fecha de registro: 21-jun-2024



IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.