Buscar en Google Scholar
Título: Construction process time optimization of a reinforced concrete reaction slab, implementing the VDC methodology
Asesor(es): Del Savio, Alexandre Almeida
Palabras clave: ConstrucciónConcretoBuildingConcrete
Campo OCDE: https://purl.org/pe-repo/ocde/ford#2.01.01
Fecha de publicación: 2023
Institución: Universidad de Lima
Resumen: The Architecture, Engineering, and Construction (AEC) industry has shown low productivity levels, mainly due to the fragmentation between the agents involved. Given this, the industry is modernizing and implement-ing collaborative methodologies to improve the development of projects. One of them is the VDC (Virtual Design and Construction) methodology. VDC allows us to improve design, construction, operation, and maintenance management, changing paradigms within traditional processes. This research shows how imple-menting VDC can help to optimize the construction process time of a reinforced concrete reaction slab in a civil engineering laboratory. As a main result, an optimized process was developed, generating a 44-day reduc-tion in the construction time of the reaction slab.
Disciplina académico-profesional: Ingeniería Civil
Institución que otorga el grado o título: Universidad de Lima. Facultad de Ingeniería y Arquitectura
Grado o título: Ingeniero Civil
Jurado: La Torre Esquivel, Darwin; Luna Torres, Ana Felícita; Salinas Saavedra, Jose Roberto; Del Savio, Alexandre Almeida
Fecha de registro: 29-ene-2024



IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.