Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Cueva, J., Tasilla, V. (2020). Influencia de una inadecuada instalación del sistema de bombeo en minería a cielo abierto, Cajamarca 2019 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/23866
Cueva, J., Tasilla, V. Influencia de una inadecuada instalación del sistema de bombeo en minería a cielo abierto, Cajamarca 2019 [Tesis]. PE: Universidad Privada del Norte; 2020. https://hdl.handle.net/11537/23866
@misc{sunedu/3038892,
title = "Influencia de una inadecuada instalación del sistema de bombeo en minería a cielo abierto, Cajamarca 2019",
author = "Tasilla Flores, Vilmer",
publisher = "Universidad Privada del Norte",
year = "2020"
}
Title: Influencia de una inadecuada instalación del sistema de bombeo en minería a cielo abierto, Cajamarca 2019
Authors(s): Cueva Sánchez, Jorge Luis; Tasilla Flores, Vilmer
Advisor(s): Luque Luque, Elmer Ovidio
Keywords: Minería; Ingeniería de Minas; Minería subterránea
OCDE field: https://purl.org/pe-repo/ocde/ford#2.07.05
Issue Date: 13-Feb-2020
Institution: Universidad Privada del Norte
Abstract: La presente investigación se realizó debido a los constantes problemas encontrados en el área de carguío y acarreo por la acumulación de agua subterránea que filtra de subsuelo por las cavidades de las tuberías a consecuencia de fallas en los equipos sumergibles en los pozo o también a consecuencia de las fuertes lluvias que tienen influencia directa en el área de carguío y acarreo, y por consiguiente esto generan problemas en los equipos como camiones y cargadores teniendo dificultad en el rendimiento de producción.
El objetivo principal es determinar la influencia de una inadecuada instalación del sistema de bombeo en minería a cielo abierto en Cajamarca, donde analizaremos el comportamiento de un mal montaje de estos equipos en el proceso de carguío.
La información que logramos recopilar se hizo a través del empleo del check list, formatos de instalación y registros, obteniéndose como resultado la determinación de un procediendo de instalación para equipos de bombeo concluyendo que con la implementación de un procedimiento de trabajo para el sistema de bombeo se va reducir demoras innecesarias en el proceso de carguío y acarreo.
The present investigation was carried out due to the constant problems encountered in the area of loading and hauling due to the accumulation of underground water that seeps from underground through the cavities of the pipes as a result of failures in the submersible equipment in the wells or also as a result of heavy rains that have a direct influence on the area of loading and hauling, and therefore this creates problems in equipment such as trucks and loaders having difficulty in production performance. The main objective is to determine the influence of an improper installation of the pumping system in open pit mining in Cajamarca, where we will analyze the behavior of a bad assembly of these equipment in the loading process. The information we managed to collect was made through the use of the check list, installation formats and records, resulting in the determination of an installation procedure for pumping equipment concluding that with the implementation of a working procedure for the pumping system unnecessary delays in the process of loading and hauling will be reduced.
The present investigation was carried out due to the constant problems encountered in the area of loading and hauling due to the accumulation of underground water that seeps from underground through the cavities of the pipes as a result of failures in the submersible equipment in the wells or also as a result of heavy rains that have a direct influence on the area of loading and hauling, and therefore this creates problems in equipment such as trucks and loaders having difficulty in production performance. The main objective is to determine the influence of an improper installation of the pumping system in open pit mining in Cajamarca, where we will analyze the behavior of a bad assembly of these equipment in the loading process. The information we managed to collect was made through the use of the check list, installation formats and records, resulting in the determination of an installation procedure for pumping equipment concluding that with the implementation of a working procedure for the pumping system unnecessary delays in the process of loading and hauling will be reduced.
Link to repository: https://hdl.handle.net/11537/23866
Note: Cajamarca
Discipline: Ingeniería de Minas
Grade or title grantor: Universidad Privada del Norte. Facultad de Ingeniería
Grade or title: Ingeniero de Minas
Register date: 19-Jun-2020; 19-Jun-2020
This item is licensed under a Creative Commons License