Citas bibligráficas
Leroy, G., (2018). Propuesta de implementación del lean manufacturing para disminuir los costos operativos en la línea de proceso de arándano fresco en la empresa Camposol S. A. [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/13856
Leroy, G., Propuesta de implementación del lean manufacturing para disminuir los costos operativos en la línea de proceso de arándano fresco en la empresa Camposol S. A. [Tesis]. PE: Universidad Privada del Norte; 2018. https://hdl.handle.net/11537/13856
@misc{sunedu/2807028,
title = "Propuesta de implementación del lean manufacturing para disminuir los costos operativos en la línea de proceso de arándano fresco en la empresa Camposol S. A.",
author = "Leroy Biasutti, Guillermo",
publisher = "Universidad Privada del Norte",
year = "2018"
}
The objective of this research was to determine the impact of the proposed implementation of Lean manufacturing on the operating costs of the blueberry process line in the company Camposol SA, using the records of products observed of the blueberry production of the year 2017 to know the production management and identify the waste in the process line. With the study it was concluded that the proposal for improvement in production management based on Lean manufacturing allows to reduce waste in operating costs from an annual waste of 310 834.71 to 157 460.24 USD which represents a reduction of 49.34%; After the application of tools and techniques of Lean manufacturing of the combination of operations, the Poka Yoke physical and the Poka Yoke of information, the training plan and the redesign of the layout of the processing plant of blueberry, it is possible to save on the cost of reprocessing 153 374.46 USD, for the use of the combination of operations, Poka Yoke and redesign of the layout, it was possible to indirectly save 590 007.08 USD in the cost of direct, indirect labor and in the cost of electricity. The improvement proposal is supported thanks to the favorable economic and financial indicators, having a NPV of 2 349 339.50 USD, an IRR of 53.11% higher than the opportunity cost of 20% and the PRI of 2.09 years and a B / C of 3.51 USD.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons