Título: Reducción de costos operativos en los tipos de materiales aplicando el método Air Deck Pre-Splitting en voladura controlada en una mina superficial Hualgayoc 2020
Asesor(es): Alva Huamán, Daniel Alejandro
Campo OCDE: https://purl.org/pe-repo/ocde/ford#2.07.05
Fecha de publicación: 17-feb-2021
Institución: Universidad Privada del Norte
Resumen: El presente trabajo justifica el cambio de método tradicional de voladura al método Air Deck (Pre-Splitting) en la voladura controlada, en la que influye la reducción de costos operativos por tipos de materiales (Costos principales en la voladura). El método que utilizaban en la voladura controlada de perforación en línea generaba más costos es por ello pasando al método de Air Deck pre-splitting a un método moderno que incurre muchas variables, pero el beneficio de ello es que optimiza los costos en explosivos y costos de perforación. Aplicando el método Air Deck se obtuvieron mejores resultados en términos de fragmentación y uniformidad, comparado con los resultados de voladura Tradicional realizados en el proyecto. Para ello mediante los softwares I blast y el Jk Slimblast se pudo obtener datos más factibles para el mejoramiento de una malla para la voladura controlada siendo así no tener back break y fly rock como resultado final. Ahora en una mina Superficial Hualgayoc se están realizando estas prácticas en la zona y están teniendo buenos resultados. Se espera que se realicen en todos los proyectos posibles con este tipo de método Air Deck –Pre Splitting, con la finalidad de reducir sus costos operativos.

The present paper justifies the change from traditional blasting method to Air Deck (Pre-Splitting) in controlled blasting, in which the reduction of operating costs by material types (principal blasting costs) influences. The method they used in the controlled blasting of on-line drilling generated more costs is thus moving the Air Deck pre-splitting method to a modern method that incurs many variables, but the benefit of this is that it optimizes the cost. Using the Air Deck method, better results were obtained in terms of fragmentation and uniformity, compared to traditional blasting results performed in the project. To do this, using the I blast and the JK Slimblast software, more feasible data could be obtained for the improvement of a mesh for the controlled blast, thus not having back break and fly rock as the final result. These practices are now being carried out in the area at a Hualgayoc surface mine and are doing well. They are expected to be carried out in all possible projects with this type of Air Deck –Pre Splitting method, in order to reduce their operating costs.
Enlace al repositorio: https://hdl.handle.net/11537/26311
Nota: Cajamarca
Disciplina académico-profesional: Ingeniería de Minas
Institución que otorga el grado o título: Universidad Privada del Norte. Facultad de Ingeniería
Grado o título: Ingeniero de Minas
Jurado: Alvarez León, Victor Eduardo; Ocas Boñon, Rafael Napoleon; Vasquez Mendoza, Oscar Arturo
Fecha de registro: 6-may-2021; 6-may-2021