Alvarez Alvarez, Goyo
Pilares Vargas, Mario Brahandon
2024-10-21T21:55:52Z
2024-10-21T21:55:52Z
2024-08-20
https://hdl.handle.net/20.500.12557/6864
La presente investigación tiene como objetivo principal demostrar la influencia en la aplicación de la metodología de BIM 3D-4D y el Sistema Last Planner System durante la planificación de un proyecto de construcción identificando interferencias, variaciones de tiempo y costo, por lo cual se analizará el proyecto “Mejoramiento y Ampliación del Mercado de Abastos de Andahuaylillas - Quispicanchi - Cusco”. Primeramente, se realizó el modelamiento BIM 3D desarrollado en el software Revit de las especialidades de estructuras e instalaciones sanitarias. Los modelos 3D obtenidos se federaron en el software Navisworks para la coordinación 3D entre las dos especialidades, en el cual se detectaron 142 interferencias, anticipando de esta manera a los profesionales a cargo antes de la ejecución. Seguidamente se obtuvieron los metrados del modelo BIM 3D de todas las partidas de la especialidad de estructuras para de esta forma calcular el costo utilizando los precios unitarios del expediente técnico de proyecto, se obtuvo el costo de la especialidad de estructuras de S/ 2,460,494.23 soles, con una variación de S/ 65,847.28 soles del costo original de expediente técnico de S/ 2,526,341.51, obteniendo una incidencia 2.6%. Posteriormente se aplicó la metodología Last Planner System, donde se determinó la sectorización más óptima para balancear recursos como el acero, encofrado y concreto, establecer el tren de actividades balanceando el recurso humano. Con lo que se optimizo el tiempo de ejecución en un total de 185 días que viene a ser 42% de la duración del cronograma del expediente técnico del proyecto. Finalmente realizamos la simulación constructiva con la planificación obtenida aplicando Last Planner System utilizando BIM 4D y la gestión visual implementada con el software PowerBI, que permite la manipulación de la base de datos obtenida del modelo BIM 3D-4D, a través de gráficos e información, lo cual facilita obtener métricas y duraciones de actividades, de sectores, cálculo de materiales, fases, etc.
The main purpose of this research is to demonstrate the influence of applying the 3D-4D BIM methodology and the Last Planner System during the planning of a construction project, identifying interferences, variations in time and cost, for this purpose the case of study the project “Improvement and Expansion of the Andahuaylillas Food Market - Quispicanchi - Cusco”. First, 3D modeling was carried out using Revit software of the specialties of structures and healthcare facilities. The 3D models obtained were federated in the Navisworks software for 3D coordination between the two specialties, in which 142 interferences were identified, thus anticipating the professionals in charge before execution. Next, the measurements of the 3D BIM model of all the items of the structures specialty were obtained in order to calculate the cost using the unit prices of the technical project file, the cost of the structures specialty of S/ 2,460,494.23 soles was obtained, with a variation of S/ 65,847.28 soles from the original cost of the technical file of S/ 2,526,341.51, obtaining an incidence of 2.6%. Subsequently, the Last Planner System methodology was applied, where the most optimal sectorization was determined to balance resources such as steel, formwork and concrete, establishing the train of activities balancing human resources. Thus, the execution time was optimized in a total of 15 days, which is 11.11% of the contractual duration. Finally, we carry out the construction simulation with the planning obtained by applying Last Planner System using 4D BIM and the visual management implemented with the PowerBI software that allows manipulating the database obtained from the 3D-4D BIM model, through graphics with information, which allows obtain metrics and durations of activities, sectors, calculation of materials, phases, etc. (en_US)
application/pdf
spa
Universidad Andina del Cusco
info:eu-repo/semantics/openAccess
http://creativecommons.org/licenses/by-nc-nd/2.5/pe/
Last Planner System
Interferencias
Planificación
Influencia en la aplicación de la metodología BIM 3d-4d y Last Planner System en las interferencias, tiempo y costo en el proyecto: “Mejoramiento y ampliación del mercado de abastos de Andahuaylillas - Quispicanchi - Cusco”
info:eu-repo/semantics/bachelorThesis
Universidad Andina del Cusco. Facultad de Ingeniería y Arquitectura
Ingeniería Civil
Ingeniero Civil
PE
https://purl.org/pe-repo/ocde/ford#2.01.01
https://purl.org/pe-repo/renati/level#tituloProfesional
46383097
https://orcid.org/0000-0002-2938-9668
70457895
732016
Alvarez Monterola, Walter Roberto
Alvarez Espinoza, Jorge
Calderón Gonzales, Werner Alfonso
https://purl.org/pe-repo/renati/type#tesis
Privada asociativa



This item is licensed under a Creative Commons License Creative Commons