Citas bibligráficas
Abad, A., Lastra, M., Siguas, J., Marquez, W., Zárate, K. (2021). Implementación de la metodología Virtual Design and construction (VDC) a la construcción del edificio José Gonzales 685 en Miraflores, Lima – Perú, 2020 [Tesis, Universidad Peruana de Ciencias Aplicadas (UPC)]. http://hdl.handle.net/10757/659073
Abad, A., Lastra, M., Siguas, J., Marquez, W., Zárate, K. Implementación de la metodología Virtual Design and construction (VDC) a la construcción del edificio José Gonzales 685 en Miraflores, Lima – Perú, 2020 [Tesis]. PE: Universidad Peruana de Ciencias Aplicadas (UPC); 2021. http://hdl.handle.net/10757/659073
@mastersthesis{renati/951285,
title = "Implementación de la metodología Virtual Design and construction (VDC) a la construcción del edificio José Gonzales 685 en Miraflores, Lima – Perú, 2020",
author = "Zárate Jiménez, Katherine Elizabeth",
publisher = "Universidad Peruana de Ciencias Aplicadas (UPC)",
year = "2021"
}
Currently, the construction sector is growing at an accelerated rate around the world, developing increasingly complex constructions, demanding the use of new technologies and tools that facilitate execution, making the difference between traditional construction projects and new improvement proposals. , even more in challenging projects. Today we have new tools such as the Virtual Design and Construction (VDC) methodology, which for some years has been imposing itself as the most appropriate way to obtain better projects in time and at a lower cost than expected, also with higher quality than expected. expected. (ESAN, 2016). In Peru, we observe a gradual growth and reactivation in the construction sector, building projects in general continue with the traditional construction system without having fully defined engineering and without implementing improvements in management technologies. This thesis shows that, by achieving a collaborative management in the project using tools such as BIM, involving subcontractors, specialists and designers in the construction stage through ICE sessions, it is possible to achieve better productivity in construction processes, less waste, optimizing the project time and reducing costs.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons