Buscar en Google Scholar
Título: IMPLEMENTACIÓN DE UNA PROPUESTA DE VALOR ENFOCADA EN BIM Y METODOLOGÍA COLABORATIVA EN LA FASE DE CONSTRUCCIÓN EN EL CASO DE ESTUDIO EDIFICIO MULTIFAMILIAR BE 525 LIMA-PERÚ
Otros títulos: Implementation of a value proposal focused on BIM and collaborative methodology in the construction phase in the case study BE 525 multifamily building Lima- Peru
Asesor(es): Uehara Yagi, Daniel
Campo OCDE: https://purl.org/pe-repo/ocde/ford#5.00.00; https://purl.org/pe-repo/ocde/ford#5.02.04
Fecha de publicación: 26-ago-2024
Institución: Universidad Peruana de Ciencias Aplicadas (UPC)
Resumen: Según Murguía et al. (2023), desarrollar una propuesta de valor basada en usos críticos de BIM es el objetivo de este proyecto de investigación. El proyecto en cuestión es el BE 525, un edificio multifamiliar de siete pisos en San Isidro-Lima que fue construido por una constructora mediana. Para hacer esto, es necesario examinar los datos sobre las características de la implementación actual de BIM en las empresas de construcción en el país. 

According to Murguia et al. (2023), developing a value proposal based on critical uses of BIM is the objective of this research project. The project in question is BE 525, a seven-story multifamily building in San Isidro-Lima that was built by a medium-sized construction company. To do this, it is necessary to examine data on the characteristics of the current implementation of BIM in construction companies in the country. The company's construction staff worked directly on the proposal to develop it. As part of the diagnosis, interviews were conducted with some of its collaborators and information was analyzed to understand their organizational vision, organization chart and the main internal and external problems that arose during the execution of the BE 525 project. Because the project was carried out Using traditional procedures and workflows, we were able to identify areas for improvement if BIM were implemented in certain processes. With this data, the BIM applications that best adapt to the current needs of the company were identified, and this information served as the basis for the creation of the value proposition, which includes a description of the requirements that the information models must meet, as well as recommendations for organizational changes, training and implementation schedules, collaboration protocols and success criteria to achieve the goals outlined in the value proposition. Finally, the analysis of the costs and benefits of implementing BIM uses in the company determining the profitability on investment, concluding in results favorable.
Enlace al repositorio: http://hdl.handle.net/10757/676278
Disciplina académico-profesional: Dirección de la Construcción
Institución que otorga el grado o título: Universidad Peruana de Ciencias Aplicadas (UPC). Escuela de Postgrado
Grado o título: Maestro en Dirección de la Construcción
Jurado: Talavera Velásquez Oscar Reynaldo; Carranza Casana Nilton César; Uehara Yagi José Daniel
Fecha de registro: 30-oct-2024



Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons