Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Tenazoa, S., (2014). Procesos de supervisión, control y cierre [Trabajo de suficiencia profesional, Universidad Nacional de la Amazonía Peruana]. http://repositorio.unapiquitos.edu.pe/handle/20.500.12737/4891
Tenazoa, S., Procesos de supervisión, control y cierre [Trabajo de suficiencia profesional]. : Universidad Nacional de la Amazonía Peruana; 2014. http://repositorio.unapiquitos.edu.pe/handle/20.500.12737/4891
@misc{renati/927116,
title = "Procesos de supervisión, control y cierre",
author = "Tenazoa Rivera, Segundo Augusto",
publisher = "Universidad Nacional de la Amazonía Peruana",
year = "2014"
}
Title: Procesos de supervisión, control y cierre
Authors(s): Tenazoa Rivera, Segundo Augusto
Advisor(s): Pita Astengo, Luis Honorato
OCDE field: http://purl.org/pe-repo/ocde/ford#5.02.04
Issue Date: 2014
Institution: Universidad Nacional de la Amazonía Peruana
Abstract: Muchas son las variables y factores que se manejan en el desarrollo o ejecución de
un determinado proyecto, y más aún cuando se tienen que administrar y controlar
varios de estos de manera simultánea, lo cual no resulta fácil si no se dispone de
una herramienta o modelo guía basado en fundamentos o estándares, que
contribuya con el éxito de la gestión empresarial. En el presente Trabajo bibliográfico
para la obtención de título de Ingeniero de Sistemas e Informática presenta un
estudio que tuvo como propósito informarse de los procesos de Supervisión, Control
y Cierre de los proyecto, basado en la metodología del PMBOK del (PMI) Project
Management Institute.
La Supervisión, Control y Cierre de los proyectos de desarrollo de software tiene
como objetivo fundamental la vigilancia de todas las actividades de desarrollo del
sistema que se está construyendo. Es una de las labores más importantes en todo
desarrollo del producto, pues un adecuado control hace posible evitar desviaciones
en costes y plazos, o al menos detectarlas cuanto antes.
Para poder ejercer una correcta supervisión, control y cierre del proyecto es
necesario que el Jefe de Proyecto dedique todo el tiempo que sea preciso a vigilar el
estado de cada una de las tareas que se están desarrollando, prestando especial
interés a aquellas que están sufriendo algún retraso. En el momento en que se
detecta cualquier desviación hay que analizar las causas para poder efectuar las
correcciones oportunas y recuperar el tiempo perdido.
Los procesos de Seguimiento, Control y Cierre de un proyecto se llevan a cabo
desde la asignación de las tareas hasta su aceptación interna por parte del equipo
de proyecto, previa a la aceptación del Cliente.
Este trabajo trata acerca de la Supervisión, Control y Cierre de varios proyectos de
desarrollo de software y propone un procedimiento de cómo ejecutar las actividades
logrando mayor eficiencia y eficacia en los resultados obtenidos.
Para el desarrollo del presente trabajo, se realizó la búsqueda de información y
análisis de referencias bibliografías teóricas y prácticas sobre administración y
control de Proyectos basadas en la Metodología del PMBOK del PMI, para luego
definir los Procesos y Mecanismos de Supervisión, Control , Cierre y Aseguramiento
de la Calidad requeridos para cada Proyecto; inmediatamente se analizaron los
Cronogramas y el Alcance de todos los Proyectos, se definieron los Medios o
Canales de Distribución de la Información relacionada con los Proyectos dentro de la
organización y se analizarán los Riesgos y Procesos de Contratación y/o
Subcontratación en cada Proyecto y finalmente se definirá una estructura estándar
para la Administración y Control para los Proyectos en desarrollo.
There are many variables and factors that are used in the development or execution of a project, and even more when you have to manage and control several of these simultaneously, which is not easy if you do not have a tool or model based on principles or standards guide, which contributes to the success of management. In this Bibliographic work for obtaining title of Engineer and Computer Systems presents a study that was aimed information processes Monitoring, Control and Closure of the project, based on the PMBOK methodology (PMI) Project Management Institute. The Supervisory Control and Closure of software development projects main purpose is monitoring all system development activities being built. It is one of the most important tasks throughout product development, adequate control makes it possible to avoid deviations in cost and time, or at least detect them sooner. In order to exercise proper supervision, control and project closure is necessary for the Project Manager devote all time necessary to monitor the status of each of the tasks that are being developed, paying special attention to those who are suffering some delay. At the moment it detects any deviation must analyze the causes to make appropriate corrections and lost time. Processes Monitoring, Control and Closing a project conducted from the allocation of tasks to your internal acceptance by the project team prior to acceptance of the Customer. This work deals with the Supervisory Control and Closure various software development projects and proposes a method of how to run the activities achieving greater efficiency and effectiveness in the results. For the development of this work, information search and analysis of references theoretical bibliographies and practices for management and control of projects based on the methodology PMBOK PMI was performed, and then define Processes and Mechanisms for Monitoring, Control, Close and Quality Assurance required for each project; Schedules were analyzed immediately and Scope of All Projects, Media and Distribution Channels Information related projects within the organization were defined and the Risks and Process of Recruitment and / or Subcontracting in each project will be analyzed and finally a standard structure for the Management and Control for developing projects will be defined. Keywords: Model Management, Administration and Control Project, PMI PMBOK Methodology Project Management Institute.
There are many variables and factors that are used in the development or execution of a project, and even more when you have to manage and control several of these simultaneously, which is not easy if you do not have a tool or model based on principles or standards guide, which contributes to the success of management. In this Bibliographic work for obtaining title of Engineer and Computer Systems presents a study that was aimed information processes Monitoring, Control and Closure of the project, based on the PMBOK methodology (PMI) Project Management Institute. The Supervisory Control and Closure of software development projects main purpose is monitoring all system development activities being built. It is one of the most important tasks throughout product development, adequate control makes it possible to avoid deviations in cost and time, or at least detect them sooner. In order to exercise proper supervision, control and project closure is necessary for the Project Manager devote all time necessary to monitor the status of each of the tasks that are being developed, paying special attention to those who are suffering some delay. At the moment it detects any deviation must analyze the causes to make appropriate corrections and lost time. Processes Monitoring, Control and Closing a project conducted from the allocation of tasks to your internal acceptance by the project team prior to acceptance of the Customer. This work deals with the Supervisory Control and Closure various software development projects and proposes a method of how to run the activities achieving greater efficiency and effectiveness in the results. For the development of this work, information search and analysis of references theoretical bibliographies and practices for management and control of projects based on the methodology PMBOK PMI was performed, and then define Processes and Mechanisms for Monitoring, Control, Close and Quality Assurance required for each project; Schedules were analyzed immediately and Scope of All Projects, Media and Distribution Channels Information related projects within the organization were defined and the Risks and Process of Recruitment and / or Subcontracting in each project will be analyzed and finally a standard structure for the Management and Control for developing projects will be defined. Keywords: Model Management, Administration and Control Project, PMI PMBOK Methodology Project Management Institute.
Link to repository: http://repositorio.unapiquitos.edu.pe/handle/20.500.12737/4891
Discipline: Ingeniería de Sistemas e Informática
Grade or title grantor: Universidad Nacional de la Amazonía Peruana. Facultad de Ingeniería de Sistemas e Informática
Grade or title: Ingeniero en Sistemas e Informática
Register date: 22-Aug-2017
This item is licensed under a Creative Commons License