Look-up in Google Scholar
Full metadata record
Arango Retamozo, Solio Marino
Ferrer Mendoza, Luisin Cristian
2024-09-06T18:04:49Z
2024-09-06T18:04:49Z
2024-09
https://hdl.handle.net/20.500.14414/22193
La presente investigación denominada: “Reemplazo de locomotora a batería por trolley para mejorar la productividad en el acarreo de Mina Poderosa, 2024”, persigue como objetivo principal aumentar la productividad de las variables de acarreo a partir de la implementación del sistema en base a locomotora en reemplazo del sistema basado en batería. La problemática esta suscrita a nivel operacional en la Compañía Minera Poderosa, en la Unidad Productiva Santa María y en el nivel 2120. La productividad del acarreo se medirá a través de los indicadores de los costos operativos (OPEX), número de viajes, tiempo de acarreo y tonelaje de acarreo. La población de estudio está representada por todos los sistemas de acarreo presentes en la Unidad Productiva Santa María de Compañía Minera Poderosa para el año 2024, la muestra de estudio se suscribe al sistema de acarreo que se encuentra operativo en el nivel 2120 de la mencionada Unidad Productiva. El tipo de investigación es Aplicada con un diseño Experimental de corte longitudinal y con un enfoque cuantitativo. Los resultados que se obtuvieron fueron: reducción en el costo de acarreo desde los 2.04 $/TMH hasta los 1.44 $/TMH, consiguiéndose un ahorro de 0.60 $/TMH. Se registró un aumento en el promedio mensual del tonelaje acarreado, desde las 953.67 TMH en diciembre del 2023 hasta las 1,364.00 TMH en enero del 2024. Un aumento en las horas efectivas de acarreo desde 15.9 hr con locomotora a batería hasta 17.1 hr con locomotora a trolley. La presente investigación concluyó en que el reemplazo de locomotora a batería por trolley resulta beneficioso a nivel operativo para la productividad del acarreo, optimizando el OPEX, numero de viajes, tiempo de ciclo y tonelaje de acarreo en la Unidad Operativa Santa María de Compañía Minera Poderosa.
The present research called: “Replacement of a battery-powered locomotive with a trolley to improve productivity in the haulage of Mina Poderosa, 2024”, pursues the main objective of increasing the productivity of the hauling variables from the implementation of the locomotive-based system. replacing the battery-based system. The problem is subscribed at the operational level in the Company Minera Poderosa, in the Santa María Productive Unit and at level 2120. The productivity of hauling will be measured through the indicators of operating costs (OPEX), number of trips, delivery time. haulage and haulage tonnage. The study population is represented by all the hauling systems present in the Santa María Productive Unit of Company Minera Poderosa for the year 2024, the study sample subscribes to the hauling system that is operational at level 2120 of the aforementioned Unit. Productive. The type of research is Applied with a longitudinal Experimental design and a quantitative approach. The results obtained were reduction in the transportation cost from $2.04/TMH to $1.44/TMH, achieving a saving of $0.60/TMH. An increase was recorded in the monthly average of hauled tonnage, from 953.67 TMH in December 2023 to 1,364.00 TMH in January 2024. An increase in effective hauling hours from 15.9 hr with a battery-powered locomotive to 17.1 hr with a battery-powered locomotive. trolley. The present investigation concluded that the replacement of a battery powered locomotive with a trolley is beneficial at an operational level for the productivity of hauling, optimizing the OPEX, number of trips, cycle time and hauling tonnage in the Santa María Operating Unit of Company Minera Poderosa
application/pdf
spa
Universidad Nacional de Trujillo
info:eu-repo/semantics/openAccess
https://creativecommons.org/licenses/by-nc-nd/4.0/
TECHNOLOGY::Civil engineering and architecture::Geoengineering and mining engineering::Mining engineering
Reemplazo de locomotora a batería por trolley para mejorar la productividad en el acarreo de mina poderosa, 2024
info:eu-repo/semantics/bachelorThesis
Universidad Nacional de Trujillo. Facultad de Ingenieria
Ingenieria de Minas
Ingeniero de Minas
PE
https://purl.org/pe-repo/ocde/ford#2.00.00
http://purl.org/pe-repo/renati/level#tituloProfesional
26733726
0000-0003-3594-0329
70001544
724026
Solio Marino, Arango Retamozo
Gamarra Reyes, Filomeno Bilmer
Ayala Orihuela, Ghercy Gustavo
http://purl.org/pe-repo/renati/type#tesis
Pública
info:eu-repo/semantics/publishedVersion



This item is licensed under a Creative Commons License Creative Commons