Citas bibligráficas
Narro, C., (2021). Productividad en el envasado de soluciones inyectables de gran volumen de un laboratorio peruano Lima, 2018. [Universidad Nacional de Trujillo]. https://hdl.handle.net/20.500.14414/18792
Narro, C., Productividad en el envasado de soluciones inyectables de gran volumen de un laboratorio peruano Lima, 2018. []. PE: Universidad Nacional de Trujillo; 2021. https://hdl.handle.net/20.500.14414/18792
@misc{renati/879763,
title = "Productividad en el envasado de soluciones inyectables de gran volumen de un laboratorio peruano Lima, 2018.",
author = "Narro Alva, Claudia Beatriz",
publisher = "Universidad Nacional de Trujillo",
year = "2021"
}
ABSTRACT The objective of this internship report was to calculate the productivity in the packaging stage of large volume injectable solutions manufactured in a Peruvian laboratory in Lima, 2018. To meet the objective, the following actions had to be performed: the monthly throughput, man hours and machine hours of the packaging process of large volume injectable solutions manufactured in a Peruvian laboratory were calculated. Obtaining as results that the monthly productivity in 2018 was between 68 to 99 % being June the month where productivity was the highest. The monthly yield ranged between 97 % to 99.5 %, having a higher yield in the months of May and July. Likewise, man hours and machine hours in 2018 were 309,000 working hours and 6,540 hours, respectively. Therefore, it is concluded that the highest performance of the packaging process of large volume injectable solutions, manufactured in a Peruvian laboratory in 2018, were the months of May and July with 99.24%, and 99.23%, respectively. A total of 309 000-man hours and 6540 machine hours were used to produce 27 604 553 vials in the packaging area of large volume solutions manufactured in a Peruvian laboratory in Lima, 2018.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons