Look-up in Google Scholar
Title: Estimación de costos para el proyecto de defensa ribereña con geocontenedores en la localidad de Maypuco distrito de Urarinas, Loreto 2018
Advisor(s): Villar Quiroz, Josualdo
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.01
Issue Date: 2019
Institution: Universidad Privada de Trujillo
Abstract: La presente investigación se llevó a cabo en el departamento de Loreto estimando los costos para el proyecto de defensa ribereña con geocontenedores. La población que se tomó fueron todos los componentes que formaron parte del estudio como los materiales de la zona y los proveedores de equipos y maquinarias, la mano de obra calificada y no calificada. El tipo de muestreo es de carácter no probabilístico y por conveniencia. Se utilizó la técnica de la observación y como instrumento una Ficha de Registro de datos para luego comparar la información recopilada registrada y definir los precios estadísticamente mediante la media aritmética. El problema es que en muchos proyectos no se hace una correcta evaluación donde se elijan los precios adecuados manteniendo los estándares de calidad y precio justo de los recursos. Para ello se ha analizado los precios y los aportes unitarios de cada componente del costo directo como mano de obra, materiales y equipos a emplearse. Con el método de análisis de precios unitarios, se llevó a cabo el análisis de las diferentes partidas que conforman el presupuesto para la defensa ribereña con geocontenedores, determinando el costo estimado total, el que incluye el Costo Directo y el Costo Indirecto.

The present investigation was carried out in the department of Loreto estimating the costs for the coastal defense project with geocontainers. The population that was taken were all the components that were part of the study such as the materials from the area and the suppliers of equipment and machinery, the skilled and unskilled labor. The type of sampling is non-probabilistic and for convenience. The technique of observation was used and as a tool a data record sheet to then compare the information collected and registered statistically by means of the arithmetic mean. The problem is that in many projects a correct evaluation is not made where the appropriate prices are chosen maintaining the quality standards and fair price of the resources. To this end, the prices and unit contributions of each component of the direct cost, such as labor, materials and equipment to be used, have been analyzed using the unit price analysis method. The analysis of the different items that make up the budget for coastal defense with geocontainers was carried out, determining the total estimated cost, which includes the Direct Cost and the Indirect Cost.
Discipline: Ingeniería Civil
Grade or title grantor: Universidad Privada de Trujillo. Facultad de Ingeniería
Grade or title: Ingeniero Civil
Register date: 2-Jul-2019

Files in This Item:
File SizeFormat 
Vargas Aguirre Fernando Titulo.pdf
  Restricted Access
11.86 MBAdobe PDFView/Open Request a copy


This item is licensed under a Creative Commons License Creative Commons