Bibliographic citations
This is an automatically generated citacion. Modify it if you see fit
Castro, C., (2023). Aplicación de relleno hidráulico en tajos de taladros largos, mediante el armado de muro de concreto [Tesis, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/27281
Castro, C., Aplicación de relleno hidráulico en tajos de taladros largos, mediante el armado de muro de concreto [Tesis]. PE: Universidad Nacional de Ingeniería; 2023. http://hdl.handle.net/20.500.14076/27281
@misc{renati/713077,
title = "Aplicación de relleno hidráulico en tajos de taladros largos, mediante el armado de muro de concreto",
author = "Castro Garay, Carlos Alberto",
publisher = "Universidad Nacional de Ingeniería",
year = "2023"
}
Full metadata record
Corimanya Mauricio, José Antonio
Castro Garay, Carlos Alberto
Castro Garay, Carlos Alberto
2024-06-27T21:03:01Z
2024-06-27T21:03:01Z
2023
http://hdl.handle.net/20.500.14076/27281
La presente tesis determina la influencia de la construcción de un muro de concreto en la base de tajo de taladros largos para la acumulación del relleno hidráulico en el ciclo de explotación minera.
El uso de este muro de concreto origina el incremento del uso de relleno hidráulico en interior mina (de 3,000 m3/mes a 12,000 m3/mes), además de la reducción en costos para el proceso de relleno (de 7.49 $/m3 a 2.77 $/m3).
Este muro al incrementar su factor de seguridad por su construcción respectiva elimina el riesgo de fuga del relleno hidráulico, evitando posibles accidentes que puedan involucrar al personal, gestión, medio ambiente y equipos.
El incremento de relleno hidráulico para interior mina origina que el sistema de bombeo, las cunetas y equipos de limpieza en vías deben estar operativos, ya que se tendrá una mayor cantidad de agua producto del relleno hidráulico el cual será evacuado del tajo por los drenajes de quenas ubicados en el muro de concreto.
Finalmente, el mayor volumen de relleno hidráulico en mina genera más vida útil para la presa de relave en superficie, esto hará disminuir el consumo de tierras colindantes a la presa, dándole facilidades para que el medio ambiente no se vea impactado y evitando posibles conflictos sociales. (es)
This thesis determines the influence of the construction of a concrete wall at the base of the long-hole pit for the accumulation of hydraulic fill in the mining cycle.
The use of this concrete wall leads to an increase in the use of hydraulic fill inside the mine (from 3,000 m3/month to 12,000 m3/month), in addition to the reduction in costs for the fill process (from $ 7.49 /m3 to $ 2.77/m3).
This wall. By increasing its safety factor due to its respective construction, eliminates the risk of leakage from the hydraulic fill, avoiding possible accidents that may involve personnel, management, the environment, and equipment.
The increase in hydraulic fill inside the mine means that the pumping system, gutters and road cleaning equipment must be operational, since there will be a greater amount of water produced by the hydraulic fill, which will be evacuated from the pit through the drainage of the mine, quenas located in the concrete wall.
Finally, the greater volume of hydraulic fill in the mine generates a longer useful life for the tailings dam on the surface, this will reduce the consumption of land adjacent to the dam, providing facilities so that the environment is not impacted and avoiding possible conflicts social. (en)
Tesis (es)
application/pdf (es)
spa (es)
Universidad Nacional de Ingeniería (es)
info:eu-repo/semantics/openAccess (es)
http://creativecommons.org/licenses/by-nc-nd/4.0/ (es)
Universidad Nacional de Ingeniería (es)
Repositorio Institucional - UNI (es)
Relleno hidráulico (mina) (es)
Taladros largos (es)
Muros de concreto (es)
Aplicación de relleno hidráulico en tajos de taladros largos, mediante el armado de muro de concreto (es)
info:eu-repo/semantics/bachelorThesis (es)
Universidad Nacional de Ingeniería. Facultad de Ingeniería Geológica, Minera y Metalúrgica (es)
Ingeniería de Minas (es)
Título Profesional (es)
Ingeniero de Minas (es)
PE (es)
http://purl.org/pe-repo/ocde/ford#2.07.05 (es)
Ingeniería (es)
http://purl.org/pe-repo/renati/nivel#tituloProfesional (es)
08079590
https://orcid.org/0000-0003-1078-4155 (es)
10527245
724026
Toribio Pando, Pedro Ángel
Landauro Abanto, Alberto
http://purl.org/pe-repo/renati/type#tesis (es)
Pública
This item is licensed under a Creative Commons License