Olivas, N., (2023). Aplicación de la metodología BIM para la mejora de la gestión de los proyectos multifamiliares [Tesis, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/27360
Olivas, N., Aplicación de la metodología BIM para la mejora de la gestión de los proyectos multifamiliares [Tesis]. PE: Universidad Nacional de Ingeniería; 2023. http://hdl.handle.net/20.500.14076/27360
@mastersthesis{renati/713035,
title = "Aplicación de la metodología BIM para la mejora de la gestión de los proyectos multifamiliares",
author = "Olivas Cahuana, Nathalie",
publisher = "Universidad Nacional de Ingeniería",
year = "2023"
}
This research work consists of five chapters. In Chapter I the problem is presented, the problems in project management and its stages are summarized and analyzed today; showing that the traditional way of working affects the profitability of companies, as well as the management of schedule, costs and communications. The hypothesis proposes the positive influence generated by the application of the BIM methodology as part of the management processes, focusing on three specific stages, therefore the objectives propose the optimization of costs, time and communication, with the purpose of execute a project with greater profitability. The hypothesis is validated with the judgment of different experts who today are generating profitability of the different projects with the application of BIM. Chapter II describes the theoretical framework, referring to the topics proposed in the research work, developing main definitions about BIM. In Chapter III, the research is developed through an analysis of the environment of the construction sector in Peru, where the macroeconomic analysis, analysis of the construction sector and indicators in the real estate sector are developed. In addition, an-interview with methodological experts was carried out, which generated a baseline for the open survey that resulted in the data for the corresponding analysis. Chapter IV presents work processes and procedures that will be outlined during the development and analysis of the project studied. In Chapter V, compatibility is made between the results generated by the application of BIM, in a study project, against another project executed in a traditional way and expert validation is also carried out. Finally, the conclusions and recommendations of the research are made.