Citas bibligráficas
Contreras, G., (2022). Gestión de costos y calidad en el proyecto de construcción I.E. 40003 Alto Selva Alegre - Arequipa [Trabajo de suficiencia profesional, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/23815
Contreras, G., Gestión de costos y calidad en el proyecto de construcción I.E. 40003 Alto Selva Alegre - Arequipa [Trabajo de suficiencia profesional]. PE: Universidad Nacional de Ingeniería; 2022. http://hdl.handle.net/20.500.14076/23815
@misc{renati/712387,
title = "Gestión de costos y calidad en el proyecto de construcción I.E. 40003 Alto Selva Alegre - Arequipa",
author = "Contreras Serrano, Gerardo",
publisher = "Universidad Nacional de Ingeniería",
year = "2022"
}
The present Professional Sufficiency Work consists on applying methods and metrics of quality and cost control in the execution of the construction project of a state educational institution in the district of Alto Selva Alegre, Arequipa. This is a project aimed at quality education, which in turn has good sports facilities for the associated student community or close to its location. Currently, each project is forcing, in a certain way, different construction companies to obtain a qualified workforce, with optimal and effective processes that guarantee the stability of the company and thus avoid technical problems (quality factors) and economic problems. (cost factor). When the engineering project is proposed, especially in the execution stage, the variables must try to maximize the benefits in terms of quality and cost so that it is as optimal as possible. Different indicators were evaluated, such as concrete quality indicators or the indicators used by Earned Value Management, on a monthly basis; in order to control the two test variables (quality and costs). As for their contributions, all these basic engineering tools will be able to control, monitor and/or disarm to maximize the use of resources and improve their efficiency. Therefore, this work deals with the application of Quality Management through tests or trials (such as the compressive strength of concrete or the soil compaction test), where it is described how Observations that can give rise to No conformity as a method of continuous improvement. In addition, in the application of Cost Management, the Earned Value Management indicators were used on a monthly basis, which serve to know if the execution of the works is according to the schedule or the budget. All this analysis of Quality and Cost Management is carried out in an unfavorable context that occurs in certain works, which in this case includes the need to execute Major Works and the stoppage of works for a few months.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons