Chipana, F., (2020). Estudio a nivel perfil del proyecto instalación de los sistemas de agua potable y alcantarillado del esquema integral Villas de Ancón - distrito de Ancón [Trabajo de suficiencia profesional, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/21834
Chipana, F., Estudio a nivel perfil del proyecto instalación de los sistemas de agua potable y alcantarillado del esquema integral Villas de Ancón - distrito de Ancón [Trabajo de suficiencia profesional]. PE: Universidad Nacional de Ingeniería; 2020. http://hdl.handle.net/20.500.14076/21834
@misc{renati/711453,
title = "Estudio a nivel perfil del proyecto instalación de los sistemas de agua potable y alcantarillado del esquema integral Villas de Ancón - distrito de Ancón",
author = "Chipana Sánchez, Flor Cecilia",
publisher = "Universidad Nacional de Ingeniería",
year = "2020"
}
This report has been developed using the information of the SEDAPAL intellectual property project: “Level Study of the Project Installation of the Potable Water and Sewerage Systems of the Villas de Ancón-Ancón District Integral Scheme”, whose objective is to propose alternatives of solution considering technical and regulatory aspects, considering as a basis, the current situation of the population of Villas de Ancón, year 2016. The “Level Study of the Project Installation of the Potable Water and Sewerage Systems of the Villas de Ancón-Ancón District Integral Scheme“ contains two alternatives for the potable water system, two alternatives for the sewerage system, three for the Wastewater treatment system and two for final disposal, submarine emissary. Likewise, its development includes attending the installation of three projected reservoirs, implementation of a conduction line, drive line, connection to the existing line of the Chillón Matrix, installation of main, secondary networks and home connections; automation system implementation with SCADA system; Installation of overflow lines in projected reservoirs, installation of main collectors, projection of drainage chambers, installation of secondary networks, as well as their respective home connections; Installation of wastewater treatment plant and final disposal through an underwater emissary. It should be noted that, as of July 2017, only Directive No. 001-2017-EF / 63.01, Directive for Multiannual Programming and Directive No. 002-2017-EF / 63.01, Directive for Formulation and Evaluation had been published in the The SNPMGI framework, however, by that date the guidelines for the Housing, Construction and Sanitation Sector had not been published for the formulation and evaluation of Invierte.pe; therefore, in the case of the project “INSTALLATION OF THE SYSTEMS OF DRINKING WATER AND SEWAGE OF THE INTEGRAL SCHEME OF VILLAS DE ANCÓN - DISTRITO DE ANCÓN”, SEDAPAL chose to continue applying the provisions of SNIP. In that sense, the profile study of this public investment project is in accordance with the minimum contents established in Annex SNIP 05 of Directive No. 001-2011-EF / 68.01, approved by R.D. No. 003-2011-EF / 68.01 and its amendment with R.D No. 008-2013-EF / 63.01. Therefore, the North Project Management. Team of the Project and Works Management of SEDAPAL, after the review, analysis and evaluation of the pre-investment study at the profile level of the project “INSTALLATION OF THE SYSTEMS OF DRINKING WATER AND SEWAGE OF THE SCHEME INTEGRAL VILLAS DE ANCÓN - DISTRITO DE ANCÓN ”, recommended granting the declaration of viability to the project within the framework of the Law of the National System of Multiannual Programming and Investment Management and its Regulation (Invierte.pe), through Technical Report N ° 1328-2017-EGP-N / VEMC dated 11.07.2017.