Vera, J., (2020). Planificación estratégica para el movimiento, montaje y puesta en marcha de un equipo de perforación de 2000 HP en plataforma fija costa afuera [Tesis, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/21788
Vera, J., Planificación estratégica para el movimiento, montaje y puesta en marcha de un equipo de perforación de 2000 HP en plataforma fija costa afuera [Tesis]. PE: Universidad Nacional de Ingeniería; 2020. http://hdl.handle.net/20.500.14076/21788
@misc{renati/711452,
title = "Planificación estratégica para el movimiento, montaje y puesta en marcha de un equipo de perforación de 2000 HP en plataforma fija costa afuera",
author = "Vera Beteta, Jorge Francisco",
publisher = "Universidad Nacional de Ingeniería",
year = "2020"
}
The search for offshore oil and gas has increased in last years, and in Peru this has not been unheard of. Drilling equipment applied to offshore operations in Peru have had to evolve and achieved the technical, logistical and economic requirements. The multimodal movement of a drilling rig involves forecasting and analyzing all stages: land, air, river and sea. Any combination of these stages deserves a detailed analysis and study. In northeastern Peru, the movements of drilling equipment are framed in the land and sea stages. A Drilling Equipment or Rig must follow an assembly procedure stipulated by the manufacturer thereof, but taking into account the needs and / or reality of the location where the Rig will be installed. The assembly of an offshore drilling equipment is a high-risk activity in which various companies that provide logistical and technical support intervene. In Peru, currently the assembly of Rigs in offshore operations develop on fixed platforms. Logistical support is provided by crane barges and small boats (supplies); and if necessary, a crane (Fixed or mobile) is used on the platform to carry out more precise maneuvers during the entire stage of assembly of the drill. The commissioning of a drilling rig follows a commissioning, inspection and certification procedure for each component. The load test is also part of commissioning and is related to an established procedure.