La ejecución de la Habilitación Urbana Alto del Prado, Etapas “I, II y III” se construyó con el expediente técnico el cual tiene como base la lotización aprobada por parte de la Municipalidad de Asia. El expediente técnico se desarrolló con los estudios previos ejecutados (topografía, estudio de mecánica de suelos, etc.), cumpliendo las directivas establecidas en la factibilidad sanitaria y factibilidad eléctrica, las cuales fueron emitidas por EMAPA CAÑETE S.A. y LUZ DEL SUR, respectivamente. En el desarrollo del expediente técnico se tubo las siguientes consideraciones: las redes de agua potable fueron diseñadas para trabajar a presión constante y se consideraron en los puntos más bajos la instalación de válvulas rompe presión, en los puntos más altos válvulas de aire, en cumplimiento de la factibilidad sanitaria, las redes de agua son abastecidas mediante el reservorio de agua existente, el cual comparten los proyectos de habilitación urbana “Alborada de Asia” y “Alto del Prado”. Para el diseño de las redes de alcantarillado, se consideró que el flujo de aguas residuales discurre por gravedad y estas alimentan a las redes matrices de alcantarillado del proyecto “Alborada de Asia”, las redes eléctricas se diseñaron y ejecutaron considerando que en cuyo trazo se evitó la superposición con las tuberías matrices de agua en el tramo correspondiente a alumbrado público y conexiones domiciliarias eléctricas. Las redes que suministran a todo el sistema eléctrico es mediante un PMI particular, las pistas y veredas de acuerdo al diseño de vías y considerando una sección de vía compuesta por una calzada de pavimento flexible confinada por sardinel sumergido, bermas y veredas laterales, cumplen lo establecido en el Estudio de Mecánica de Suelos, finalmente se complementa el desarrollo de la habilitación urbana con la señalización para tránsito peatonal y vehicular, tanto horizontal y vertical, y la delimitación de lotes mediante hitos, rotulado de las cajas de agua y desagüe para su fácil identificación. La supervisión de la ejecución de la “Habilitación Urbana Alto del Prado, Etapas I, II y III”, contemplo que la obra cumpla con los requerimientos establecidos en el expediente técnico y el aseguramiento de las especificaciones técnicas al momento de ejecutar la obra, llevando controles continuos de topografía, calidad de materiales utilizados, así como pruebas de campo (pruebas hidráulicas de instalación de tuberías de agua y alcantarillado, estanqueidad de buzones de desagüe, compactación, megados, Slump, etc.). Al término de la ejecución de los trabajos de la habilitación urbana, se solicitó las conformidades técnicas de las obras de agua y alcantarillado a EMAPA CAÑETE S.A. y energía eléctrica a LUZ DEL SUR, cuyas conformidades de obra certifican la buena ejecución de estas obras, en cumplimiento del expediente técnico del proyecto aprobado, dando inicio al funcionamiento de las redes de agua y alcantarillado, así como el suministro de energía al proyecto. (es)
The execution of Urban Habilitation Alto del Prado, stages “I, II and III“ was built with the technical file which is based on the subdivision approved by the Municipality of Asia. The technical file was developed with the previous studies carried out (topography, study of soil mechanics, etc.), complying with the directives established in the sanitary feasibility and electrical feasibility, which were issued by EMAPA CAÑETE S.A. and LUZ DEL SUR, respectively. In the development of the technical file, the following considerations were made: the drinking water networks were designed to work at constant pressure and the installation of pressure break valves was considered at the lowest points, at the highest points air valves, in compliance From sanitary feasibility, the water networks are supplied by the existing water reservoir, which is shared by the urban development projects “Alborada de Asia” and “Alto del Prado”. For the design of the sewerage networks, it was considered that the wastewater flow flows by gravity and these feed the main sewer networks of the “Alborada de Asia“ project, the electrical networks were designed and executed considering that in whose line it is It avoided overlapping with the main water pipes in the section corresponding to public lighting and electrical household connections. The networks that supply the entire electrical system is through a particular PMI, the tracks and sidewalks according to the road design and considering a section of track composed of a flexible pavement carriageway bordered by submerged sardinel, berms and side sidewalks, comply with the established in the Study of Soil Mechanics, finally the development of urban habilitation is complemented with signaling for pedestrian and vehicular traffic, both horizontal and vertical, and the delimitation of lots by milestones, labeling of the water and drainage boxes for their easy identification. The supervision of the execution of the “Urban Habilitation Alto del Prado, Stages I, II and III“, I contemplate that the work complies with the requirements established in the technical file and the assurance of the technical specifications at the time of executing the work, carrying continuous controls of topography, quality of materials used, as well as field tests (hydraulic tests of installation of water and sewage pipes, tightness of drain boxes, compaction, megados, Slump, etc.). At the end of the execution of the urban development works, the technical conformities of the water and sewerage works were requested from EMAPA CAÑETE S.A. and electric power to LUZ DEL SUR, whose work conformities certify the good execution of these works, in compliance with the technical file of the approved project, starting the operation of the water and sewerage networks, as well as the supply of energy to the project. (en)
Trabajo de suficiencia profesional (es)
application/pdf (es)
spa (es)
Universidad Nacional de Ingeniería (es)
info:eu-repo/semantics/openAccess (es)
http://creativecommons.org/licenses/by-nc-nd/4.0/ (es)
Universidad Nacional de Ingeniería (es)
Repositorio Institucional - UNI (es)
EMAPE Cañete S.A. (es)
Luz del Sur (es)
Habilitación urbana (es)
Ejecución de obras (es)
Formulación del expediente técnico y supervisión de la construcción de una habilitación urbana en la costa (es)
info:eu-repo/semantics/bachelorThesis (es)
Universidad Nacional de Ingeniería. Facultad de Ingeniería Civil (es)
Ingeniería Civil (es)
Título Profesional (es)
Ingeniero Civil (es)
PE (es)
http://purl.org/pe-repo/ocde/ford#2.01.01 (es)
Ingeniería (es)
http://purl.org/pe-repo/renati/nivel#tituloProfesional (es)
06024813
46177127
732016
Ríos Segura, Juan Guillermo
Huari Cama, Eduardo Dionisio
http://purl.org/pe-repo/renati/type#trabajoDeSuficienciaProfesional (es)
Pública



This item is licensed under a Creative Commons License Creative Commons