Huaman, E., (2020). Lecciones aprendidas de la aplicación del DL N° 30225 sobre prestaciones de adicionales de obras en carreteras [Trabajo de suficiencia profesional, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/21738
Huaman, E., Lecciones aprendidas de la aplicación del DL N° 30225 sobre prestaciones de adicionales de obras en carreteras [Trabajo de suficiencia profesional]. PE: Universidad Nacional de Ingeniería; 2020. http://hdl.handle.net/20.500.14076/21738
@misc{renati/711336,
title = "Lecciones aprendidas de la aplicación del DL N° 30225 sobre prestaciones de adicionales de obras en carreteras",
author = "Huaman Orosco, Elliot",
publisher = "Universidad Nacional de Ingeniería",
year = "2020"
}
This Sufficiency report presents, casuistically, the problems that the work additions have been presenting in the execution of the Road Works in Peru, regulated by the State Contracting regulations. Specifically, the criteria and analysis of the regulations and how they were applied are detailed, as well as the results and problems that they raised within the contractual development of the work project: “Improvement of the Chupuro - Vista Alegre - Chicche - Chongos Alto - Huasicancha Highway”. Given the significant economic resources that are allocated to public investment projects in road infrastructure, the evaluation of the causes that generate the additional work benefits identified in the execution stage is very relevant. However, a correct evaluation of these causes is more important at the formulation stage of the technical file in order to reduce its impact on the cost of the work. This cost increases due to factors such as: inefficient engineering studies, poorly prepared budgets, longer work periods, additional services, controversies in the execution of the contract, higher metrics, interests, etc. The present work aims to assess the main causes that originate the additional works that influence the variation of the contractual budget of a public road infrastructure work. The most incident factors that generated the budget increase during the execution stage of the work are evaluated. Initially, the aspects that intervene in the conception of the road project are mentioned, such as: the study of the technical file, the analysis of the state contracting regulations Law No. 30225, the regulations and directives of the Comptroller General of the Republic as control body. It then continues with the identification of the main causes that increase the cost of the contractual budget that are evident during the development of the work and that in the investment phase should have been better evaluated. Likewise, the problems that arose in the applicability of the State Contracting Law in the management of additional work services are described casuistically. With this, alternatives are finally recommended that help reduce these difficulties based on the lessons learned and agile procedures.