Citas bibligráficas
Bullón, W., (2020). Desarrollo de chimeneas utilizando equipo con plataforma trepadora en operaciones y proyectos mineros mecanizados [Trabajo de suficiencia profesional, Universidad Nacional de Ingeniería]. http://hdl.handle.net/20.500.14076/20815
Bullón, W., Desarrollo de chimeneas utilizando equipo con plataforma trepadora en operaciones y proyectos mineros mecanizados [Trabajo de suficiencia profesional]. PE: Universidad Nacional de Ingeniería; 2020. http://hdl.handle.net/20.500.14076/20815
@misc{renati/711031,
title = "Desarrollo de chimeneas utilizando equipo con plataforma trepadora en operaciones y proyectos mineros mecanizados",
author = "Bullón Salvatierra, Wimpy",
publisher = "Universidad Nacional de Ingeniería",
year = "2020"
}
This work has been developed in order to evaluate the methods of construction of chimneys, both conventional and mechanized with climbing platform “Alimak“, its theoretical aspects and experiences in the Raúl mine of the Company Minera Condestable S.A. The work began with the question: What method of construction of chimneys will be applied, and which one is the most appropriate for its application in the Raúl mine of the Compañía Minera Condestable SA ?, being the objective: to analyze the methods of construction of chimneys which are currently being applied at the Raúl mine. Assuming that: the chimney construction method with climbing platform “Alimak” is the most suitable for its application in the Raúl mine of Compañía Minera Condestable S.A. The generalities of the mine are developed, which contain sections referring to the accessibility location of the mine, resources of the area, organization chart of the operations. Also, the regional, structural, local and economic geology is described, where it studies the geological characteristics of the deposit and shows the amount of resources and reserves of minerals that the deposit posees; the geometry of the rock massif where the chimneys will develop. The basic concepts of the conventional methods and the “Raise Climber” method with “Alimak” climbing platform are also mentioned, mentioning some background, definition of basic terms and the identification of variables. The calculations of yields and unit costs of chimney constructions are carried out by the “Raise Climber” method with “Alimak” climbing platform and the conventional method.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons