Buscar en Google Scholar
Título: Tecnolog?a BIM y la optimizaci?n de la productividad en obras retail
Asesor(es): Torres P?rez, Enrique Luis; Torres P?rez, Enrique Luis
Campo OCDE: https://purl.org/pe-repo/ocde/ford#2.01.01
Fecha de publicación: 2015
Institución: Universidad Ricardo Palma - URP
Resumen: La presente investigaci?n tuvo como objetivo general determinar qu? relaci?n existe entre la Tecnolog?a Bim y la Productividad en obras Retail en el departamento de Lima. 2016. La poblaci?n o universo de inter?s en esta investigaci?n, est? conformada por la poblaci?n motivo de ?sta investigaci?n que estuvo conformado por 300 Ingenieros Civiles y Arquitectos, que laboran en obras Retail, con conocimientos en la Tecnolog?a BIM en la ciudad de Lima, la muestra probabil?stica consider? 60 Ingenieros Civiles y Arquitectos, en los cuales se han empleado las variables: Tecnolog?a Bim y Productividad en obras Retail. El m?todo empleado en la investigaci?n fue el hipot?tico-deductivo. Esta investigaci?n utiliz? para su prop?sito el dise?o no experimental de nivel correlacional de corte transeccional, que recogi? la informaci?n en un per?odo espec?fico, que se desarroll? al aplicar las encuestas de Tecnolog?a BIM y la encuesta de Productividad en obras Retail de 30 preguntas cada una con escala de Likert, que brindaron informaci?n acerca de la relaci?n que existente entre ambas variables. La investigaci?n concluye que: El resultado de Rho de Spearman de 0.775, El cual sirve para saber si hay relaci?n entre 2 variables (BIM y Productividad) indica que existe relaci?n positiva entre las variables, se acepta la hip?tesis general, Esto quiere decir que aplicando correctamente la Tecnolog?a BIM en obras de Retail podemos mejorar la productividad, reduciendo gastos de tiempo, recurso, planificaci?n. Por tanto se concluye que: La tecnolog?a BIM optimiza la productividad en obras Retail. This research has the overall objective to determine what relationship exists between BIM and Productivity in Retail works in the department of Lima. 2015. The population or population of interest in this research consists of the reason for this research population was consist of 300 civil engineers and architects, working in works Retail, skilled in the BIM Technology in Lima, the probabilistic sample consider 60 Civil and Architects, Engineers in which the variables have been used: Bim Technology and Productivity in Retail works. The method used in the research was the hypothetical-deductive. This research used for the purpose correlational no experimental design of transactional level court, which collected information over a specific period, which was developed by applying BIM technology surveys and survey works Retail Productivity 30 questions each with Likert scale, which provided information about that relationship between the two variables. The research concludes that: The result of Rho of Spearman 0.775, which is used to indicates that there is a positive relationship between the variables also lies in the level of high correlation and accepts the general assumption. This means that applying correctly BIM Technology in Retails woks we can upgrade the productivity, lowing cost in waste time, resource, and planificaci?n. Therefore we conclude that: The BIM technology optimizes productivity Retail works in the Department of Lima.
Disciplina académico-profesional: Ingenier?a Civil
Institución que otorga el grado o título: Universidad Ricardo Palma. Facultad de Ingenier?a. Escuela Profesional de Ingenier?a Civil
Grado o título: Ingeniero Civil
Fecha de registro: 14-ago-2019; 14-ago-2019



Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons