Look-up in Google Scholar
Title: An?lisis comparativo del enrocado y del sistema bolsacreto en la construcci?n de la rada interior del Proyecto Lima Marina Club, Costa Verde
Advisor(s): Chavarr?a Reyes, Liliana Janet; Chavarr?a Reyes, Liliana Janet
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.01
Issue Date: 2015
Institution: Universidad Ricardo Palma - URP
Abstract: La presente tesis es de tipo cuantitativa y descriptiva. El dise?o ser? transversal y comparativo, en la cual compararemos como influyen los tiempos y costos mediante an?lisis y precios unitarios, para dos sistemas de protecci?n de costas. El primero ser? enrocado y el otro ser? Bolsacreto. El Bolsacreto al tener presencia de concreto se realizar? una muestra de 54 probetas cil?ndricos de 10 cm (4 pulgadas) de di?metro y 20 cm( 8pulgadas) de altura; con hormigones de distintas resistencias: f?c= 245 kg/cm2, f?c= 280 kg/cm2 con aditivos s?per plastificantes SP-4, W-73; y para el dise?o de alta resistencia y tremie de f?c= 420 kg/cm2, con un aditivo micro s?lice Master Life SC-100 y s?per plastificante LD GAIA 300, siendo seis dise?os establecidos donde cualquiera puede ser usados. En esta comparaci?n se logr? una reducci?n de tiempo de construcci?n de 278 d?as y una reducci?n de costos que esta entre S/.1 131,809 con 00/100 Nuevos Soles y S/.1 803,687 con 00/100 Nuevos Soles con el sistema Bolsacreto demostrando que es m?s eficiente. As? de esta manera los resultados guardan relaci?n con la obtenida por VEGA CRESPO (2004) cuya reducci?n de tiempo fue de 90 a 30 d?as y una reducci?n de costos de $ 2 300,000 D?lares Americanos con el sistema Bolsacreto, demostrando que este sistema es m?s eficiente. This thesis is quantitative and descriptive type. The design is transversal and comparative, at which we will compare how they influence time and cost through analysis and unit prices for two coastal protection systems, one will be castled and the other will be Bolsacreto. Bolsacreto having concrete presence in it, will take a sample of 54 cylindrical specimens of 10 cm (4 inches) in diameter and 20 cm (8 inches) tall; concretes with different strengths: fc = 245 kg / cm2, fc = 280 kg / cm2 with super plasticizer additive SP-4, W-73 and for the design of high strength and tremie of fc = 420 kg/cm2 with additive micro silica MasterLife SC100 and plasticizer LD GAIA 300; any of these six established designs is free for anyone to use. The results of this comparison, was a conquest in construction time of 278 days and a cost reduction, standing between S/.1 131,809 with 00/100 Nuevos Soles and S/.1 803,687 with 00/100 Nuevos Soles with the system Bolsacreto demonstrating being the most efficient of both. Our results relate to those obtained by VEGA CRESPO (2004), whose time was reduced from 90 to 30 days and had a cost reduction of $ 2 300,000 US Dollars with Bolsacreto system, showing its efficiency.
Discipline: Ingenier?a Civil
Grade or title grantor: Universidad Ricardo Palma. Facultad de Ingenier?a. Escuela Profesional de Ingenier?a Civil
Grade or title: Ingeniero Civil
Register date: 20-Aug-2019; 20-Aug-2019



This item is licensed under a Creative Commons License Creative Commons