Bibliographic citations
Torres, A., (2022). Propuesta e implementación de un SGSST en la Empresa Sermitran E.I.R.L, para minimizar los accidentes en los vehículos de transporte. Cerro de Pasco –Atacocha. 2019 [Universidad Peruana de Las Américas]. http://repositorio.ulasamericas.edu.pe/handle/upa/2313
Torres, A., Propuesta e implementación de un SGSST en la Empresa Sermitran E.I.R.L, para minimizar los accidentes en los vehículos de transporte. Cerro de Pasco –Atacocha. 2019 []. PE: Universidad Peruana de Las Américas; 2022. http://repositorio.ulasamericas.edu.pe/handle/upa/2313
@misc{renati/5919,
title = "Propuesta e implementación de un SGSST en la Empresa Sermitran E.I.R.L, para minimizar los accidentes en los vehículos de transporte. Cerro de Pasco –Atacocha. 2019",
author = "Torres Gavino, Aldair Eugenio",
publisher = "Universidad Peruana de Las Américas",
year = "2022"
}
The NEXA RESOURCES ATACOCHA Mining Unit is dedicated to the exploration and exploitation of mining concessions, including the production and sale of lead, zinc and copper concentrates; and it also has several specialist companies that are dedicated to carrying out other activities within the mining unit. The SERMITRAN Company, a specialist in the field of transportation, is in charge of providing transportation services for personnel, fuel and tools. During my time of service in the company, initially as an Engineering intern in the Operations and Safety area, there were many incidents and/or accidents involving vehicles within the mining unit, both on the surface and in the tunnel. For this reason, I investigated, evaluated and carried out an OHSMS plan, which was approved by the SSO and General Management areas. After the implementation of this SGSST, a reduction in the number of mishaps in trucks, vans, tankers, etc. was observed; In addition, it was possible to perceive an improvement in the performance of the personnel, thanks to the OHS training, Security Management Tools (IPERC, CHECK LIST, Work Order, PETS), Defensive Management, Critical Risks, which as a result of everything mentioned , I generate a better fluidity when the staff performs and evaluates their respective Safety Management tools (IPERC, CHEK LIST) before starting their activity within the Mining Unit Likewise, the availability of the vehicles improved, since this time there was a Maintenance Plan, also with a CHECK LIST of tools updated monthly, and a cycle of departure to the mechanical workshop for their respective revision and maintenance to evaluate their mechanical conditions, readjustments and scans.
This item is licensed under a Creative Commons License