Barreto, C., (2023). Diseño de una planta procesadora de producción de harina a partir de la cabeza de langostino para alimento balanceado de aves en el distrito De La Cruz – Tumbes [Universidad Católica Santo Toribio de Mogrovejo]. http://hdl.handle.net/20.500.12423/7319
Barreto, C., Diseño de una planta procesadora de producción de harina a partir de la cabeza de langostino para alimento balanceado de aves en el distrito De La Cruz – Tumbes []. PE: Universidad Católica Santo Toribio de Mogrovejo; 2023. http://hdl.handle.net/20.500.12423/7319
@misc{renati/583678,
title = "Diseño de una planta procesadora de producción de harina a partir de la cabeza de langostino para alimento balanceado de aves en el distrito De La Cruz – Tumbes",
author = "Barreto Dezar, Cesar Fernando",
publisher = "Universidad Católica Santo Toribio de Mogrovejo",
year = "2023"
}
The solid residues of the industries of hydrobiological products such as the heads of prawns, generate the possibility of obtaining by-products as flours that can be used as raw material for feeding animals since they have a high content of proteins, carbohydrates, fats, pigments, minerals, chitin, among others, which are attractive when formulating new food products. For the first objective that is the market study, the demand and supply of the product was investigated, in this way the unsatisfied demand of the market was calculated and thus the demand of the project was obtained. Regarding the second result that is the design of the plant, the necessary guidelines were established to achieve the level of production required, the evaluation and selection of the necessary engineering for the flour process from the shrimp heads. To finalize the third result, which is the economic-financial evaluation, the projected financial results (profit and loss statements, cash flows and balance sheets) were obtained with the help of indicators such as net annual value (NPV) And the Return Rate (IRR), with which it was possible to determine if the project is economically acceptable. In the case of this project, the NPV amounts to a positive amount which is S/ 3 418 734,36 and the TIR, which yielded 47 %, respectively.