Citas bibligráficas
Vargas, O., (2024). Optimizar el plan de minado considerando el riesgo e incertidumbre de la ley del oro en el Proyecto San Gabriel – Compañía de Minas Buenaventura S.A.A [Pontificia Universidad Católica del Perú]. http://hdl.handle.net/20.500.12404/28736
Vargas, O., Optimizar el plan de minado considerando el riesgo e incertidumbre de la ley del oro en el Proyecto San Gabriel – Compañía de Minas Buenaventura S.A.A []. PE: Pontificia Universidad Católica del Perú; 2024. http://hdl.handle.net/20.500.12404/28736
@mastersthesis{renati/535351,
title = "Optimizar el plan de minado considerando el riesgo e incertidumbre de la ley del oro en el Proyecto San Gabriel – Compañía de Minas Buenaventura S.A.A",
author = "Vargas Machuca Bueno, Octavio Benigno",
publisher = "Pontificia Universidad Católica del Perú",
year = "2024"
}
In current mining, one of the most important elements in the decision-making stage is the identification of risk and uncertainty; However, conventional risk assessment techniques do not provide sufficient or detailed risk information. Large mining projects carry significant financial risk, requiring a more complex risk assessment methodology that considers potential sources of uncertainty. It should be noted that the main source of risks inherent in the mining investment process is related to the deposit evaluation process, which is the most crucial step. This research gives an example of the optimization of a mining plan taking into consideration the risk and uncertainty of the Gold Grade in mining projects, as well as developing and validating a method to evaluate the risk of variation in the Grade. of Au in the mining plan. The use of this model is a real case that involves a gold deposit, the geology is made up of breccia and a system of faults that control mineralization. It is necessary to indicate that the methodology implemented for this project includes stages such as: the definition of the most representative domains of the study area, as well as the five-year annual mining plan, among others. Likewise, a potential loss of 17% can be determined, which would imply US$ 19.6 MM (US$ 115.3 MM to US$ 95.7 MM, in the first five years). Therefore, when executing the drilling mesh it would cost US$ 2.4 MM. Which indicates that this project is viable.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons