Asis, C., (2024). Evaluación de impacto ambiental del proyecto ampliación y mejoramiento del servicio de riego del canal de Ocupampa – Mutgo [Pontificia Universidad Católica del Perú]. http://hdl.handle.net/20.500.12404/26737
Asis, C., Evaluación de impacto ambiental del proyecto ampliación y mejoramiento del servicio de riego del canal de Ocupampa – Mutgo []. PE: Pontificia Universidad Católica del Perú; 2024. http://hdl.handle.net/20.500.12404/26737
@misc{renati/532841,
title = "Evaluación de impacto ambiental del proyecto ampliación y mejoramiento del servicio de riego del canal de Ocupampa – Mutgo",
author = "Asis Gamarra, Cristhian Mauricio",
publisher = "Pontificia Universidad Católica del Perú",
year = "2024"
}
An investigation was carried out to determine the environmental impact assessment, in the project for the improvement and expansion of the irrigation service of the Ocupampa - Mutgo canal, in order to analyze the effectiveness of the qualitative assessment method with the software EIA 09 to forecast the impacts on the project and then validate the results using the Monte Carlo simulation. To do this, a study was carried out in the area to determine the viability of the project since it should benefit the nearby population in some way. Afterwards, a description of the project should be included, in general, to know the scope of its elaboration. Simultaneously, all this helped to carry out a total analysis of the impacts within the project and obtain an inventory of impacts to be evaluated. On one hand, within the environmental impact assessment (EIA), the means that are involved in the project were identified, such as: geology, soil, air, surface water, groundwater, fauna, flora, landscape, economic and territorial. On the other hand, the project had two stages of evaluation of construction and operation; Furthermore, each stage is divided by 5 sectors determined by canal irrigation progressives to compare results at the end of the evaluation. Likewise, each sector is divided by its structure: the water intake, the existing canal irrigation, the pipe canal, the proposed canal irrigation and the quarry. Then, through an event-action tree that was carried out by each sector in each stage, the impacts for the factors involved were identified. After identifying the impacts, they were screened in order to separate negligible impacts from significant ones. Consequently, each impact was introduced to the software EIA 09 so that it can carry out an assessment and compare the results to determine which sectors are with the highest impact index. Then, with the results obtained by the environmental impact assessment, a way was sought to mitigate the impacts with greater severity and this does not affect the project environment. Finally, using the Monte Carl simulation, an evaluation of the data obtained by the EIA09 program was applied in order to validate the results. With this analysis, comparisons were made of the means in each sector and for each stage evaluated.