Catalán, W., (2018). Propuesta de mejora en el área de mantenimiento, aplicando TPM, para reducir costos en la minera Tahoe Resources La Arena [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/13459
Catalán, W., Propuesta de mejora en el área de mantenimiento, aplicando TPM, para reducir costos en la minera Tahoe Resources La Arena [Tesis]. PE: Universidad Privada del Norte; 2018. https://hdl.handle.net/11537/13459
@misc{renati/524339,
title = "Propuesta de mejora en el área de mantenimiento, aplicando TPM, para reducir costos en la minera Tahoe Resources La Arena",
author = "Catalán Cubas, Walter Edmundo",
publisher = "Universidad Privada del Norte",
year = "2018"
}
This thesis was carried out in the TAHOE RESOURCES LA ARENA MINING UNIT, due to the fact that it currently had high operational costs due to an inadequate management of mine maintenance in its equipment and machinery used for operations and extraction processes of the mine. mineral. This work has been developed in order to reduce the current operational costs of the TAHOE RESOURCES LA ARENA MINING UNIT, for this purpose it has been proposed to improve the current situation of the Maintenance Area through a proposal for improvement by applying Total Productive Maintenance (TPM) ). To carry out this improvement proposal, in the first place, the diagnosis of the current situation of the Mine Maintenance Area process was made, that the main problems that increase the operational costs are: tertizan the corrective maintenance, breach the preventive maintenance plan , the lack of a Total productive maintenance (TPM), there are no spare parts for critical equipment, there is no linkage with production indicators and there is no management by KPI indicators. For the development of the improvement proposal, the following methodology and tool was used: TPM, which will help improve maintenance management. This proposal for improvement was achieved by reducing plant shutdowns by 5%, an increase in standardized procedures through the implementation of BPM to 72% and a Total Productive Maintenance of the machinery, replacement by critical equipment and management by KPI indicators at 70.8% . To complete it, an economic financial evaluation was carried out, obtaining a NPV of S /. 26927.00 and an IRR of 49.1%, which indicates that the project is PROFITABLE.