Bibliographic citations
Muñoz, L., Rivasplata, C. (2014). Mejora del sistema de gestión de calidad en la empresa Agua del Cumbe S.R.L. mediante la aplicación del sistema HACCP y las siete herramientas estadísticas de calidad [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/182
Muñoz, L., Rivasplata, C. Mejora del sistema de gestión de calidad en la empresa Agua del Cumbe S.R.L. mediante la aplicación del sistema HACCP y las siete herramientas estadísticas de calidad [Tesis]. PE: Universidad Privada del Norte; 2014. https://hdl.handle.net/11537/182
@misc{renati/522884,
title = "Mejora del sistema de gestión de calidad en la empresa Agua del Cumbe S.R.L. mediante la aplicación del sistema HACCP y las siete herramientas estadísticas de calidad",
author = "Rivasplata Martínez, César",
publisher = "Universidad Privada del Norte",
year = "2014"
}
ABSTRACT This project was done in order to improve the Quality Management System in “Agua del Cumbe“ Company, We started identifying the errors generated for not having established procedures, nor work methods to do the production tasks of the mineral water. For the project, we have applied 2 important topics: “The Hazard Analysis and Critical Control Points System” and “The 7 Statistical Quality Tools”, which have inherently used to achieve the goal. With HACCP we identified the Critical Control Points in the production process, and we determined the maximum permissible limits and their corrective actions in case they were necessary. And with Quality Tools we identified failures and flaws that made the process very deficient, so we decided to prepare corrective actions, which have been used to standardize times and measures of work, making the daily work more tidy and efficient. The study done in the company has provided to its personal of the physical and cognitives tools, necessaries to get better results in quality, and this is also a consequence of the aplication of Good Manufacturing Practice (GMP) and the Standard Operating Procedures (SOP). It is very true that the project has achieved a lot of improvements in productivity and quality, but even there are any debilities to resolve which require an economical investment. For this topic we have elaborated a set of proposals, which have been projected to the next 5 years and show us that they are totally profitable.
This item is licensed under a Creative Commons License