Bibliographic citations
Díaz, A., (2015). Optimización de la gestión y dirección de la construcción del tramo III del acceso principal al proyecto Conga aplicando metodología de los estándares del PMBOK y Last Planner System, 2014 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/6902
Díaz, A., Optimización de la gestión y dirección de la construcción del tramo III del acceso principal al proyecto Conga aplicando metodología de los estándares del PMBOK y Last Planner System, 2014 [Tesis]. PE: Universidad Privada del Norte; 2015. https://hdl.handle.net/11537/6902
@misc{renati/521315,
title = "Optimización de la gestión y dirección de la construcción del tramo III del acceso principal al proyecto Conga aplicando metodología de los estándares del PMBOK y Last Planner System, 2014",
author = "Díaz Chávez, Aurea Lorena",
publisher = "Universidad Privada del Norte",
year = "2015"
}
ABSTRACT This research was conducted in the project: “Construction of Section III of the Main Access to Conga’s Project,“ located between the districts of Huasmín and Sorochuco, Province Celendín and Encañada, Province of Cajamarca, Department of Cajamarca - Peru, held in 2014, where methodology and standards PMBOK Last Planner System, recognized globally applied. This study is a no experimental research transectional Descriptive and data collection had two scenarios, one in cabinet and another on site with Primary Sources. For the implementation of the methodology, supervision of the construction area of Conga’s Project has applied standards PMBOK and Last Planner System in initiating, planning, executing, monitoring and control and project closure. In the Project Initiation stage the scope of the project was conducted and stakeholders were defined. In the planning stage direction different plans for the project were developed, it defined the schedule and budget. During the implementation phase, monitoring and control tool Earned Value Management is used and inserted Last Planner System for scheduling jobs every week. Concluding that the application standards PMBOK Last Planner System and optimize the management and direction of projects and compliance with the approved budget and schedule as planned taking Status Indicators project ensures: CPI and SPI.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.