Citas bibligráficas
Flores, J., (2018). Optimización de tiempo en la ejecución del mantenimiento preventivo en equipos HVAC implementando técnicas de mantenimiento predictivo en la empresa Wood Proyectos S.A.C. [Trabajo de suficiencia profesional, Universidad Privada del Norte]. https://hdl.handle.net/11537/14426
Flores, J., Optimización de tiempo en la ejecución del mantenimiento preventivo en equipos HVAC implementando técnicas de mantenimiento predictivo en la empresa Wood Proyectos S.A.C. [Trabajo de suficiencia profesional]. PE: Universidad Privada del Norte; 2018. https://hdl.handle.net/11537/14426
@misc{renati/520833,
title = "Optimización de tiempo en la ejecución del mantenimiento preventivo en equipos HVAC implementando técnicas de mantenimiento predictivo en la empresa Wood Proyectos S.A.C.",
author = "Flores Tacas, Juan Jose",
publisher = "Universidad Privada del Norte",
year = "2018"
}
The present work of professional sufficiency having as a thesis structure the improvement of processes, has a proposal to optimize the execution times of preventive maintenance to HVAC equipment (Air conditioning and forced ventilation) in the service company WOOD PROYECTOS SAC, using the knowledge and tools acquired in the industrial engineering career that will demonstrate the viability of this proposal. The PDO, procedures, new work formats will be used in order that the field technician has all the necessary to register the values found in each team, and in this way to increase the technician's productivity in the field and can meet more preventive maintenance work orders and being able to comply with the corrective maintenance orders that users generate in the field. This present work will be carried out in four stages, in order not to neglect what frames this As a first stage we will perform an evaluation of the initial condition and know our intervention time for each type of equipment, the frequency in which it is executed and number of preventive maintenance orders and number of corrective maintenance orders generated in the back log either by repair or by change of some component or complete equipment, with which we have until now. Either by repair or by changing a component or complete equipment, Second stage, the stages of each type of maintenance will be analyzed and a comparison table will be developed. The alternative of implementing predictive maintenance and being able to elaborate the procedures, formats in order to implement predictive maintenance techniques will be evaluated. Third stage, the number of hours required for each type of preventive maintenance before and after its implementation will be calculated and the results compared. Fourth stage, An economic evaluation will be conducted to determine if it is profitable to implement these techniques as part of the maintenance package of HVAC equipment, either by material costs, labor, equipment availability and the time saved by the company for to be