Citas bibligráficas
Melgarejo, M., Peralta, H. (2022). Potencial geológico económico basado en el estudio conceptual de descubrimiento para el proyecto minero Mario Alonso, Áncash 2021 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/31144
Melgarejo, M., Peralta, H. Potencial geológico económico basado en el estudio conceptual de descubrimiento para el proyecto minero Mario Alonso, Áncash 2021 [Tesis]. PE: Universidad Privada del Norte; 2022. https://hdl.handle.net/11537/31144
@misc{renati/520731,
title = "Potencial geológico económico basado en el estudio conceptual de descubrimiento para el proyecto minero Mario Alonso, Áncash 2021",
author = "Peralta Tapia, Hugo Eber",
publisher = "Universidad Privada del Norte",
year = "2022"
}
The objective of the research report was to carry out a conceptual discovery study to determine the economic geological potential in the Mario Alonso mining project of the Huanquin Uno and Huanquin Dos mining concessions in the Ancash region. The type of research is Applied, with the Non-Experimental Cross-Descriptive research design. The sample consisted of the Mario Alonso mining project, owned by the company María Teresa S.A.C. To carry out the information processing, we worked with the technique of documentary analysis and observation with its document analysis guide instruments and field observation guide and among the methods used were the analytical and systemic method, obtaining as a result that the mining project presents good potential considering a resource estimate of 412,120.8 MT of quartz with gold values that vary between <5 to 6,491 ppm (quartz vein with gold), concluding that the Mario Alonso mining project presents a total income of $ 1,758,729.55, a total expenses of $ 470,994.84, a cash balance of $ 1,287,734.73 and a net present value of $ 6,991,240.68 considering a discount rate of 16.5%, for which the Mario Alonso mining project is profitable.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons