Look-up in Google Scholar
Full metadata record
Vega Rivera, Gerson
Rivera Chuquillanqui, Alfonso Maximo
2019-05-19T17:04:02Z
2019-05-19T17:04:02Z
2019-04-17
Rivera, A. M. (2019). Propuesta de mejora en la gestión de la construcción de una nave industrial en la etapa de estructuras, según lineamientos del PMBOK® en alcance, costo y tiempo, ubicado en región La Libertad, año 2018 [Tesis de licenciatura, Universidad Privada del Norte]. Repositorio de la Universidad Privada del Norte. https://hdl.handle.net/11537/21263 (es_PE)
624.068 RIVE 2019 (es_PE)
https://hdl.handle.net/11537/21263
La presente investigación tiene como objetivo principal determinar de qué manera la aplicación de los lineamientos del PMBOK, 6ta. Edición del (PMI) en alcance, costo y tiempo permiten mejorar la gestión de la construcción de una Nave industrial a nivel de estructuras, en la región La Libertad, año 2018. En un proyecto que comprende de una cimentación de concreto armado que sirve como base para el montaje de estructuras metálicas que conforman los muros y techos con coberturas de material térmico. Esta obra se inicia el 26 de febrero de 2018, con la entrega de terreno efectuada por el propietario con un plazo inicial de 125 días calendario; en vista que el proyecto estaba en desarrollo y solo se contaba con los planos de cimentación de la nave principal que sirvió para presupuestar esta porción del proyecto con el que se firmó un contrato de construcción por el monto de S/ 1 101 587,54 soles sin IGV. Al inicio de las excavaciones para cimentación se detectó restricciones entre las cuales la principal fue la napa freática alta que variaba las condiciones de obra contratada, dando origen a un adicional que estaba por el 50% del monto de la obra. Con este escenario inicial se contrató la gestión y supervisión de la obra, que inició labores a partir del 8 de marzo de 2019 con una reunión de involucrados, en la que se tomaron importantes acuerdos para dar solución a las restricciones y prepararse para el resto de obra considerando que la ejecución se hizo según los entregables del proyecto. Luego, de levantadas las restricciones y con un presupuesto adicional reducido se reiniciaron las obras de cimentación y comenzaron también las cotizaciones de otros paquetes de obras que comprenden el proyecto general las cuales se fueron programando su ejecución según se terminaban los planos del proyecto general hasta terminar la etapa de estructuras que tuvo una duración de 238 días, periodo que inicia desde el día lunes 26 de febrero y culmina el 21 de octubre de ese mismo año y con un presupuesto que ascendió a S/ 4 612 971,85 soles sin IGV. El proyecto evidenció en su etapa final un índice de desempeño del 90%, lo que nos indica un retraso en el cronograma y un índice de desempeño de 95% respecto a los costos; y los factores que influyen se presenta a través de un diagrama de Ishikawa, tales como: el mínimo seguimiento del cronograma, errores de estimación, diseño poco consistente en la ejecución, principalmente. (es_PE)
The main objective of this research is to determine how the application of the PMBOK guidelines, 6th. Edition of the (PMI) in scope, cost and time allow to improve the management of the construction of an industrial building at the level of structures, in the La Libertad region, year 2018. In a project that includes a reinforced concrete foundation that serves as base for the assembly of metallic structures that make up the walls and ceilings with thermal material covers. This work begins on February 26, 2018, with the delivery of land made by the owner with an initial term of 125 calendar days; in view of the fact that the project was in development and only had the foundation plans of the main warehouse that served to budget this portion of the project with which a construction contract was signed for the amount of S / 1 101 587.54 soles without VAT. At the beginning of the excavations for foundation, restrictions were detected, among which the main one was the high water table that varied the conditions of the contracted work, giving rise to an additional one that was for 50% of the amount of the work. With this initial scenario, the supervision of the work was contracted, which began work as of March 8, 2019 with a meeting of involved parties, in which important agreements were taken to resolve the restrictions and prepare for the rest of the work considering that the execution will be according to the deliverables of the project. Then, once the restrictions were lifted and with a reduced additional budget, the foundation works were restarted and the quotations for other works packages that comprise the general project began to be scheduled, which were scheduled to be executed as the plans of the general project were finished until the end. the stage of structures that lasted 238 days, a period that begins on Monday, February 26 and ends on October 21 of that same year and with a budget that amounted to S / 4 612 971.85 soles without VAT. The project showed in its final stage a performance index of 90%, which indicates a delay in the schedule and a 95% performance index with respect to costs; and the influencing factors are presented through an Ishikawa diagram as the minimum follow-up of the schedule, estimation errors, inconsistent design in execution, mainly. (es_PE)
Tesis (es_PE)
application/pdf (es_PE)
application/msword
spa (es_PE)
Universidad Privada del Norte (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
https://creativecommons.org/licenses/by-nc-sa/3.0/us/
Universidad Privada del Norte (es_PE)
Repositorio Institucional - UPN (es_PE)
Costos de construcción (es_PE)
Gestión de la construcción (es_PE)
Concreto armado (es_PE)
Cimentaciones (es_PE)
Estructuras (es_PE)
Propuesta de mejora en la gestión de la construcción de una nave industrial en la etapa de estructuras, según lineamientos del PMBOK® en alcance, costo y tiempo, ubicado en región La Libertad, año 2018 (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Privada del Norte. Facultad de Ingeniería (es_PE)
Ingeniería Civil (es_PE)
Título Profesional (es_PE)
Ingeniero Civil (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.01.01 (es_PE)
Pregrado (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
10390118
https://orcid.org/0000-0002-8672-3239
09142344
732016 (es_PE)
Guardia Calixto, César Manuel
Rivera Ulloa, César Augusto
Vidal Velásquez, Manuel Nahon
https://purl.org/pe-repo/renati/type#tesis (es_PE)
Privada societaria



This item is licensed under a Creative Commons License Creative Commons