Look-up in Google Scholar
Full metadata record
Rojas Escobar, José Alvan
Carhuapoma Diaz, Niwel Cremer
Gervacio Marquina, Santos Wilmer
2021-07-02T23:45:44Z
2021-07-02T23:45:44Z
2021-03-29
Carhuapoma, N. C., & Gervacio, S. W. (2020). Evaluación de la etapa de limpieza y extracción mecanizado para optimizar los costos de minado de una mediana minera de La Libertad, 2019 (Tesis de licenciatura). Repositorio de la Universidad Privada del Norte. Recuperado de https://hdl.handle.net/11537/27079 (es_PE)
622 CARH 2020 (es_PE)
https://hdl.handle.net/11537/27079
En el presente trabajo de investigación se realizó la evaluación de la etapa de limpieza y extracción mecanizado para optimizar los costos de minado de una mediana minera de la Libertad, 2019, esto debido a que en la empresa en la cual se tomaron los datos, se observó una serie problemas en las etapas de limpieza y extracción de desmonte y mineral por los equipos de tracklees como es el Scoop LHD 203 y Dumper TH 315, determinado principalmente los problemas se dan por la falta de mantenimiento de vías para el recorrido de los equipos. Se realizó una evaluación de producción (t/h) y costo (USD/t) desde los meses de octubre del 2019 a marzo de 2020, para la etapa de limpieza con Scoop LHD 203 con producción de 16,10 t/h y 9,70 t/h así como en costos de USD 4,36/t y USD 7,23/t en el recorrido de 250 m y 350 m para limpieza de desmonte y mineral respectivamente; para la extracción empleando Dumper TH 315 se obtuvo un promedio de producción de 25,90 t/h y 25,50 t/h y en costos fue de USD 5,03/t y USD 5,10/t. Se arregló las vías de transporte y se implementó en ambos turnos el mantenimiento. Seguido se hizo la evaluación de producción (t/h) y costo (USD/t), durante los meses de abril a agosto de 2020, teniendo para la etapa de limpieza con Scoop LHD 203 una producción de 26,90 t/h y 11,60 t/h así como en costos de USD 3,35/t y USD 6,01/t en el recorrido de 250 m y 350 m para limpieza de desmonte y mineral respectivamente; para la extracción empleando Dumper TH 315 se obtuvo un promedio de producción de 37,20 t/h y 37,80 t/h y en costos de USD 3,49/t y USD 3,44/t. Finalmente se concluyó que al hacer el mantenimiento de vías en forma permanente implica una disminución de tiempo de limpieza y extracción, por lo tanto, disminuyen los costos unitarios y se incrementa la productividad, obteniendo un ahorro promedio mensual de USD 24 117,00. (es_PE)
In the present research work, the evaluation of the mechanized cleaning and extraction stage was carried out to optimize the mining costs of a medium-sized mining company in La Libertad, 2019, this because in the company in which the data was collected, observed a series of problems in the cleaning and extraction stages of waste and mineral by tracklees equipment such as Scoop LHD 203 and Dumper TH 315, mainly determined the problems are due to the lack of maintenance of roads for the route of the equipment. An evaluation of production (t / h) and cost (USD / t) was carried out from the months of October 2019 to March 2020, for the cleaning stage with Scoop LHD 203 with production of 16.10 t/h and 9, 70 t/h as well as costs of USD 4.36/t and USD 7.23/t in the 250 m and 350 m route for waste and mineral cleaning respectively; For the extraction using Dumper TH 315 an average production of 25.90 t/h and 25.50 t/h was obtained and in costs it was USD 5.03/t and USD 5.10/t. The transport routes were fixed and maintenance was implemented in both shifts. The production (t/h) and cost (USD/t) evaluation was then carried out during the months of April to August 2020, with a production of 26.90 t/h and 11 for the cleaning stage with Scoop LHD 203 , 60 t/h as well as costs of USD 3.35/t and USD 6.01/t in the 250 m and 350 m route for waste and mineral cleaning respectively; For the extraction using Dumper TH 315, an average production of 37.20 t/h and 37.80 t/h was obtained and costs of USD 3.49/t and USD 3.44/t. Finally, it was concluded that permanently maintaining roads implies a reduction in cleaning and extraction time, therefore, unit costs decrease and productivity increases, obtaining an average monthly saving of USD 24,117.00. (es_PE)
Tesis (es_PE)
application/pdf (es_PE)
application/msword (es_PE)
spa (es_PE)
Universidad Privada del Norte (es_PE)
info:eu-repo/semantics/openAccess (es_PE)
https://creativecommons.org/licenses/by-nc-sa/3.0/us/
Universidad Privada del Norte (es_PE)
Repositorio Institucional - UPN (es_PE)
Producción (es_PE)
Costos de producción (es_PE)
Minería (es_PE)
Evaluación de la etapa de limpieza y extracción mecanizado para optimizar los costos de minado de una mediana minera de La Libertad, 2019 (es_PE)
info:eu-repo/semantics/bachelorThesis (es_PE)
Universidad Privada del Norte. Facultad de Ingeniería (es_PE)
Ingeniería de Minas (es_PE)
Título Profesional (es_PE)
Ingeniero de Minas (es_PE)
PE (es_PE)
https://purl.org/pe-repo/ocde/ford#2.07.05 (es_PE)
Pregrado (es_PE)
https://purl.org/pe-repo/renati/level#tituloProfesional (es_PE)
18216894
https://orcid.org/0000-0001-8453-2183 (es_PE)
43412706
26962726
724026 (es_PE)
Escalante Rojas, Juan Carlos
Vilca Perez, Jesus Gabriel
Zelada Mosquera, Danny Stephan
https://purl.org/pe-repo/renati/type#tesis (es_PE)
Privada societaria



This item is licensed under a Creative Commons License Creative Commons