Title: Planificación de requerimiento de materiales mrp para mejorar la cadena de suministro en la empresa Begas Ingenieros S.A.C, Lima - 2020
Advisor(s): Aguilar Monterrey, Segundo Freddy
OCDE field: http://purl.org/pe-repo/ocde/ford#2.11.04
Issue Date: Sep-2021
Institution: Universidad Peruana de las Américas
Abstract: La presente investigación tuvo como objetivo general, determinar la influencia de la planificación de requerimientos de materiales MRP para mejorar la cadena de suministro de la empresa Begas Ingeniero, 2020. Para poder alcanzar el objetivo, se ha aplicó una metodología de enfoque cuantitativo, utilizando datos numéricos para el análisis de los resultados; con tipología aplicada, ya que se hace uso de conocimientos obtenidos previamente y desarrollados; de alcance correlacional porque busca determinar las influencia de una variable sobre la otra; de diseño cuasiexperimental, porque se manipularon de manera deliberada, la variable independiente para analizar su efecto sobre la dependiente, aplicada a un grupo ya establecido; de corte transaccional, ya que los datos se recolectaron en un solo momento. La población y muestra para esta investigación estuvo conformada por 9 empleados del área de logística de la empresa. Se utilizó como técnica de recolección de datos, la encuesta, con su instrumento el cuestionario, conformado por 40 ítems. Se concluyó que existe una relación significativa entre la planificación de requerimientos de materiales MRP y la cadena de suministro de la empresa Begas Ingenieros S.A.C, Lima – 2020.

The present investigation had as general objective, to determine the influence of the planning of MRP materials requirements to improve the supply chain of the company Begas Ingenieros S.A.C, 2020. In order to achieve the objective, a quantitative approach methodology has been applied, using data numerical for the analysis of the results; with applied typology, since it makes use of previously obtained and developed knowledge; correlational in scope because it seeks to determine the influence of one variable on the other; quasi-experimental design, because the independent variable was deliberately manipulated to analyze its effect on the dependent, applied to an already established group; transactional, since the data was collected in a single moment. The population and sample for this research consisted of 9 employees from the company's logistics area. The survey was used as a data collection technique, with its instrument the questionnaire, made up of 40 items. It was concluded that there is a significant relationship between the planning of MRP materials requirements and the supply chain of the company Begas Ingenieros S.A.C, Lima - 2020.
Discipline: Ingeniería Industrial
Grade or title grantor: Universidad Peruana de las Américas. Facultad de Ingeniería
Grade or title: Ingeniero Industrial
Juror: Negron Martinez, Consuelo Carmen; Torres Sime, Cesar Lorenzo; Aguilar Monterrey, Segundo Freddy
Register date: 21-Sep-2021; 21-Sep-2021

Files in This Item:
File Description SizeFormat 
LOPEZ NEIRA.pdf3.37 MBAdobe PDFView/Open
LOPEZ NEIRA.pdf
  Restricted Access
3.37 MBAdobe PDFView/Open Request a copy


This item is licensed under a Creative Commons License Creative Commons