Bibliographic citations
Huanca, A., (2022). Aplicación del Lean Construction para optimizar la productividad de la mano de obra en viviendas multifamiliares de 10 pisos en el distrito de Breña [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/31400
Huanca, A., Aplicación del Lean Construction para optimizar la productividad de la mano de obra en viviendas multifamiliares de 10 pisos en el distrito de Breña [Tesis]. PE: Universidad Privada del Norte; 2022. https://hdl.handle.net/11537/31400
@misc{renati/517683,
title = "Aplicación del Lean Construction para optimizar la productividad de la mano de obra en viviendas multifamiliares de 10 pisos en el distrito de Breña",
author = "Huanca Pilco, Alfredo Fortunato",
publisher = "Universidad Privada del Norte",
year = "2022"
}
The realization of this research arises from the need to prevent labor costs for projects in the construction sector, since labor is one of the important components that affect construction costs, it is also one of the variables that affect productive operations. The objective is to establish the necessary documents to determine improvements in productivity, it is necessary to know the different factors that affect the workforce, classifying them and determining a methodology to measure their impact on labor yields and consumption of the different processes , which constitutes an important and unexpected additional cost overrun. The provision of budgets on labor costs does not take into account the disaggregated structures of work and originates deviations of the costs in the contracts of the different resources, such as labor, controlling costs through process systems in construction works Civil has become a simple and practical tool for construction companies, since it is a simple and economic control system over time. The analysis of the workforce will help to prevent and establish a cost control structure of the workforce based on the real information that generates an effective construction process, so that you can have real physical information on the final budget of the play. This research will help us to know a control system of labor costs to avoid cost overruns in specific projects.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.