Citas bibligráficas
Bardalez, D., Vinces, M. (2018). Propuesta de mejora en las áreas de producción y mantenimiento para incrementar la rentabilidad de la empresa Maderas la Perla del Huallaga E. I. R. L [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/13193
Bardalez, D., Vinces, M. Propuesta de mejora en las áreas de producción y mantenimiento para incrementar la rentabilidad de la empresa Maderas la Perla del Huallaga E. I. R. L [Tesis]. PE: Universidad Privada del Norte; 2018. https://hdl.handle.net/11537/13193
@misc{renati/517200,
title = "Propuesta de mejora en las áreas de producción y mantenimiento para incrementar la rentabilidad de la empresa Maderas la Perla del Huallaga E. I. R. L",
author = "Vinces Vargas, Marilyn Yerussa Jazmin",
publisher = "Universidad Privada del Norte",
year = "2018"
}
The present investigation has as general objective to increase the profitability of the company Maderas la Perla del Huallaga E.I.R.L., through the improvements in the Production and Maintenance Areas. To identify the problems, a value mapping study was carried out, where it was possible to visualize: lack of training of the workers, lack of planning of the production, lack of preventive - predictive maintenance, lack of order in the warehouse, particulate material in the air, lack of cleanliness in the plant, lack of production and maintenance indicators. In the production area, 3 improvement proposals were integrated. The improvement in the warehouse was made based on the 5S methodology, the programming of the materials was solved by means of an MRP system and the lack of order and cleanliness through the renovation of machine. These proposals allowed to increase the productivity. The TPM methodology was carried out in the maintenance area, which is based on the 5S, with which it was possible to implement an autonomous maintenance plan for the main machines and a personnel training plan. Through the use of this methodology it was possible to establish the current Global Efficiency of each team (EGE) and increase it with the improvements of the TPM. The results achieved were: - A material requirement plan, which will reduce its costs due to lack of raw material in S /.16,000.00 per month. - It was possible to establish a 5S Plan to maintain order and cleanliness, reducing its cost in S /. 1,827.28 per month. - The implementation of a modern Tableadora machine, will reduce the time of operation which means in costs, a saving of S /. 1,630.36 per month. - The order was reduced in the raw material warehouse, saving S / .189.01 per month. - The OEE of the tableadora machine was increased by 16.67%, of the brush cutter machine was increased by 10.19% and of the jointer machine increased by 13.79%. The current standard time of the company is 20.67 min and the proposed standard time is 18.26 min. The financial evaluation allowed us to obtain a Net Present Value (NPV) of S / 425,408.92, an Internal Rate of Return (IRR) equal to 42.02% and a Benefit / Cost coefficient (B / C) equal to 3.76, this means that for each inverted sun, 2.76 soles of profit will be obtained. It stated that the project is profitable for the company.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons