Citas bibligráficas
Dávila, R., Dávalos, J. (2019). Propuesta de mejora de la gestión de mantenimiento basada en el TPM para evaluar el efecto en la disponibilidad de flota en la operación remota Sausacocha, de la empresa automotriz, 2017 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/14976
Dávila, R., Dávalos, J. Propuesta de mejora de la gestión de mantenimiento basada en el TPM para evaluar el efecto en la disponibilidad de flota en la operación remota Sausacocha, de la empresa automotriz, 2017 [Tesis]. PE: Universidad Privada del Norte; 2019. https://hdl.handle.net/11537/14976
@misc{renati/516708,
title = "Propuesta de mejora de la gestión de mantenimiento basada en el TPM para evaluar el efecto en la disponibilidad de flota en la operación remota Sausacocha, de la empresa automotriz, 2017",
author = "Dávalos Ayay, José Luis",
publisher = "Universidad Privada del Norte",
year = "2019"
}
The research sought to determine the impact of maintenance management on the TPM, on the availability of the fleet; the existence of a disjointed maintenance management, which has a focus on the result and not on the process, which can be explained by inefficiency in the management of liquidity, which leads to the unavailability of resources and infrastructure for maintenance; also because of inefficiency in the management of human resources, and of service providers. Contribute to the solution, carry out an analysis of the units' critique, focus on the diagnosis of management indicators (average waiting time for forced labor and average time). of the stop) in the units. Deepening the roots cause, identified at the base of a matrix of interaction with the indicators of the cause and effect of the variable, as well as with the losses generated. From the results, it was concluded that, the maintenance management was based on the TPM, there was a significant impact on the availability of the fleet, it was increased from 94.10% to 95.37%, the repair costs were recorded ( S / 190,902, 12) and shortage of inventory (S /. 158,709.25) and increased production (S / .831,725.64) and valuation sales (S /. 359,662.59), in the company client and provider; This is feasible insofar as improvements are focused on the basis of the diagnosis of the units, and in the area of production with the maintenance of the base of autonomous maintenance, having the support of management (TPM in administrative areas). ), based on the availability of financial resources (in order to cover timely expenses to ensure the availability of bays) and the involvement of production personnel (based on pyramid training to achieve the career line or professional development) )); Likewise, we guarantee a planned maintenance, at the same time not only we respond to the quality of the spare parts and / or materials, but also to the opportune disposition of the resources (undertaking the management of the providers the service of personnel transfer and the disposition of equipment and / or tools), thus achieving, reducing the average waiting time for forced labor and stoppage, going from 2.55 to 0.91 h and from 2.69 to 0.96 h respectively.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons