Citas bibligráficas
Pachamango, J., Villanueva, K. (2015). Evaluación energética del proceso de elaboración de concreto premezclado para reducir costos de producción en la empresa Cemento Pacasmayo S.R.L [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/5280
Pachamango, J., Villanueva, K. Evaluación energética del proceso de elaboración de concreto premezclado para reducir costos de producción en la empresa Cemento Pacasmayo S.R.L [Tesis]. PE: Universidad Privada del Norte; 2015. https://hdl.handle.net/11537/5280
@misc{renati/516408,
title = "Evaluación energética del proceso de elaboración de concreto premezclado para reducir costos de producción en la empresa Cemento Pacasmayo S.R.L",
author = "Villanueva Castrejón, Karina Janeth",
publisher = "Universidad Privada del Norte",
year = "2015"
}
This research project is the evaluation of the energy situation of the company Cemento Pacasmayo Cajamarca in order to propose technical and operational changes that will increase energy efficiency by improving the production process and optimizing productivity. For this information was collected by measurements in different equipment company, mainly those that consume electricity; evaluating the energy state of the most important characteristic indicators in the different business processes. After analyzing and evaluating the energy situation some proposals for improvements made from the results, based on energy-saving opportunities that were found in each sector, leading to reduced energy costs is presented. Among the results, the change in energy indicators are evidence for a 6-month evaluation, obtaining efficient results as 0.39 kWh / Ton and inefficient values of 6.46 kWh / Ton, which demonstrates a great opportunity for energy savings and therefore economical. The largest increase in saving electricity as well as the cost of production, he would by the change in the electricity tariff, which currently is in the MT2 rate, so serious proposal in change MT3 without no investment involved. While it is true, the project is very specific to Pacasmayo SRL Cement Plant; Cajamarca headquarters, the methodology used to find the solution to the problem is replicable because it involves a series of criteria for analyzing a process to any project that seeks to generate energy savings.
IMPORTANTE
La información contenida en este registro es de entera responsabilidad de la universidad, institución o escuela de educación superior que administra el repositorio académico digital donde se encuentra el trabajo de investigación y/o proyecto, los cuales son conducentes a optar títulos profesionales y grados académicos. SUNEDU no se hace responsable por los contenidos accesibles a través del Registro Nacional de Trabajos de Investigación – RENATI.