Citas bibligráficas
Aliaga, G., (2015). Plan de mejora del sistema de producción basado en ingeniería de métodos para incrementar la productividad en una ensambladora de extractores de aire [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/6231
Aliaga, G., Plan de mejora del sistema de producción basado en ingeniería de métodos para incrementar la productividad en una ensambladora de extractores de aire [Tesis]. PE: Universidad Privada del Norte; 2015. https://hdl.handle.net/11537/6231
@misc{renati/515195,
title = "Plan de mejora del sistema de producción basado en ingeniería de métodos para incrementar la productividad en una ensambladora de extractores de aire",
author = "Aliaga Chavez, Gudelia Edell",
publisher = "Universidad Privada del Norte",
year = "2015"
}
ABSTRACT This thesis had as main objective Improvement Plan Production System based engineering methods to increase productivity and reduce operating costs in an assembly of air extractors. All factors that influence the deficiency productivity and high operating costs, including those identified factors were analyzed has the highest % of reprogramming assemblies, recurrent inspection of raw materials, high costs for electricity consumption and bonuses for additional hours. To submit proposals for improvement was developed Pareto diagram, Ishikawa diagram, line balancing, among others. The results are: 1. Increased productivity. 2. Reduction of reprogramming of assemblies. 3. Reduction of expenditure for payment of electricity and bonuses. 4. Reduction of expenditure by replacement of hand tools. 5. Reduction of time by inspection of some characteristics of the raw material (extractors). With the implementation of the proposed improvements has resulted in increased productivity of 12,199 to 21,544 assemblies per day. In addition the% reprogram assemblies 20% was reduced to 4.97%. As for restocking costs of hand tools, power and payroll where was determined as a reduction target: 2, 2.45 and 77.06%, respectively, we noted a further reduction to set a target to: 0.81, 2.12, 73.58% respectively. Furthermore, it has determined a reduction in the standard times in inspection operations where building standards and use of hand tools of 6. 74 min to 4.33 min and 19.23 min to 13.69 min, respectively.
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons