Alvarez, J., Asencio, L. (2022). Evaluación económica del proyecto minero Alta Gracia, Yonán - 2021 [Tesis, Universidad Privada del Norte]. https://hdl.handle.net/11537/31230
Alvarez, J., Asencio, L. Evaluación económica del proyecto minero Alta Gracia, Yonán - 2021 [Tesis]. PE: Universidad Privada del Norte; 2022. https://hdl.handle.net/11537/31230
@misc{renati/513375,
title = "Evaluación económica del proyecto minero Alta Gracia, Yonán - 2021",
author = "Asencio Valera, Leila Judith",
publisher = "Universidad Privada del Norte",
year = "2022"
}
Título: Evaluación económica del proyecto minero Alta Gracia, Yonán - 2021
Asesor(es): Ocas Boñón, Rafael Napoleón
Palabras clave: Yacimientos minerales; Rentabilidad; Costos; Minería; Veta de hierro; Iron vein; Profitability; VAN; TIR
Campo OCDE: https://purl.org/pe-repo/ocde/ford#2.07.05
Fecha de publicación: 3-jun-2022
Institución: Universidad Privada del Norte
Resumen: En la presente investigación se determinó las reservas de mineral y los costos de operación con el fin de evaluar la rentabilidad económica del Proyecto Minero Alta Gracia Yonán 2021, ubicado en el paraje Ventanilla, distrito de Yonán, provincia de Contumazá. Realizando el levantamiento topográfico de la labor principal de la mina como primera etapa de la investigación, datos que permitieron determinar las principales características de la veta de hierro para un adecuado diseño y construcción, así mismo se realizó los cálculos en gabinete para determinar las reservas de mineral y los costos de operación del proyecto minero, obteniendo como resultados que el proyecto minero cuenta con 87595.32 TM de reserva total de material roto y se tendrá una producción de 60 TM/día, además se tiene un costos de inversión inicial de US$ 663917.67 y un costo de plan de minado anual de US$ 447835.03. Finalmente se realizó la evaluación económica logrando obtener resultados óptimos como un VAN de US$ 426 402.03, un TIR de 45.7%, el Payback de 1 año 10 meses 6 días y la Relación Beneficio/Costo de 1.64, concluyendo así que el proyecto es económicamente rentable al realizar la explotación por el método de corte y relleno ascendente.
The present investigation, the mineral reserves and operating costs were determined in order to evaluate the economic profitability of the Alta Gracia Yonán Mining Project 2021, located in the place Ventanilla, district of Yonán, province of Contumazá. Carrying out the topographic survey of the main work of the mine as the first stage of the research, data that allowed to determine the main characteristics of the iron vein for an adequate design and construction, Likewise, the calculations were made in the cabinet to determine the mineral reserves and the operating costs of the mining project, obtaining as results that the mining project has 87595.32 MT of total reserve of broken material and will have a production of 60 MT / day, in addition to having an initial investment cost of US $ 663917.67 and an annual mining plan cost of US $ 447835.03. Finally, the economic evaluation was carried out, achieving optimal results such as a NPV of US$ 426 402.03, an IRR of 45.7%, the Payback of 1 year 10 months 6 days and the Benefit/Cost Ratio of 1.64, thus concluding that the project is economically profitable when carrying out the exploitation by the method of cutting and ascending filling.
The present investigation, the mineral reserves and operating costs were determined in order to evaluate the economic profitability of the Alta Gracia Yonán Mining Project 2021, located in the place Ventanilla, district of Yonán, province of Contumazá. Carrying out the topographic survey of the main work of the mine as the first stage of the research, data that allowed to determine the main characteristics of the iron vein for an adequate design and construction, Likewise, the calculations were made in the cabinet to determine the mineral reserves and the operating costs of the mining project, obtaining as results that the mining project has 87595.32 MT of total reserve of broken material and will have a production of 60 MT / day, in addition to having an initial investment cost of US $ 663917.67 and an annual mining plan cost of US $ 447835.03. Finally, the economic evaluation was carried out, achieving optimal results such as a NPV of US$ 426 402.03, an IRR of 45.7%, the Payback of 1 year 10 months 6 days and the Benefit/Cost Ratio of 1.64, thus concluding that the project is economically profitable when carrying out the exploitation by the method of cutting and ascending filling.
Enlace al repositorio: https://hdl.handle.net/11537/31230
Disciplina académico-profesional: Ingeniería de Minas
Institución que otorga el grado o título: Universidad Privada del Norte. Facultad de Ingeniería
Grado o título: Ingeniero de Minas
Jurado: Alva Huamán, Daniel Alejandro; Girón Palomino, Danyer Stewart; Chuquiruna Chávez, Wilder
Fecha de registro: 7-sep-2022