Title: Análisis comparativo entre sistema de losa aligerada tradicional y prefabricada Vigacero en una vivienda unifamiliar de 4 pisos, Trujillo 2022
OCDE field: https://purl.org/pe-repo/ocde/ford#2.01.01
Issue Date: 5-Apr-2023
Institution: Universidad Privada del Norte
Abstract: Debido a la demanda inmobiliaria, las empresas buscan nuevos sistemas que sean eficientes y logren reducir costos y tiempos, para así reemplazar los tradicionales que muchas veces causan sobrecostos y errores debido a la falla humana. Por lo que, la presente investigación tiene como objetivo realizar un análisis comparativo referente a costos y tiempos de ejecución, entre el sistema Vigacero y el sistema tradicional de losas aligeradas, en una vivienda unifamiliar de 4 pisos en la ciudad de Trujillo. Esta investigación tiene un enfoque cuantitativo y diseño no experimental a nivel descriptivo. Como resultados se obtuvo, una reducción del costo total del proyecto de S/.24,383.83 soles, utilizando el sistema Vigacero. Asimismo, el tiempo de ejecución de este sistema es 28 días más rápido que el convencional; además de ser el sistema que menos material utiliza para el encofrado y vaciado de losas aligeradas, por lo que tiene menor huella de carbono. Finalmente se concluyó que la mejor opción es el sistema Vigacero, por su menor costo y tiempo de ejecución, que a su vez conlleva a un menor costo de los gastos generales; además de tener menor impacto en el ambiente y ser un sistema liviano y de fácil instalación.

Due to the real estate demand, companies are looking for new systems that are efficient and manage to reduce costs and times, to replace the traditional ones that often cause cost overruns and errors caused by human error. That is why this research aims to conduct a comparative analysis about costs and execution times, between the Vigacero system and the traditional system of lightened slabs, in a 4-story single-family home in the city of Trujillo. This research has a quantitative approach, non-experimental design at a descriptive level. As a result, a reduction of the total cost of the project of S/.24,383.83 soles were obtained, using the Vigacero system. Likewise, the execution time of this system is 28 days faster than the conventional one. In addition, it was found that it is the system that uses less material for formwork and emptying of lightened slabs, therefore it has a lower carbon footprint. Finally, it was concluded that the best option is the Vigacero system, due to its lower cost and execution time, which in turn leads to a lower general expense; in addition to having less impact on the environment and being a lightweight system that is easy to install.
Discipline: Ingeniería Civil
Grade or title grantor: Universidad Privada del Norte. Facultad de Ingeniería
Grade or title: Ingeniero Civil
Juror: Sagastegui Vásquez, German; Diaz Garcia, Gonzalo Hugo; Alvarado Ruiz, Cinthya